Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-17441
Well Classification: GW Status: PR - 3/1/2024
Well Name/No:WERNING #8-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:60181
Facility Status:PRStatus Date3/1/2024
FacilityID:249638LocationID:332845
Municipality/County:EVANS / WELD #123Location:SENE 3 4N66W 6
Field:WATTENBERG - #90750Elevation:4678 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1756FNL  535 FELLat/Long: 40.343745 / -104.755971Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.343770 / -104.755800Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2024             Measured TD: 7383 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2024
Wellbore Permit
Permit #:931374 Expiration Date:1/25/1994
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:2/19/1994
Measured TD:7383 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: 1ST, Hole Size: 9.625 in., Size: 7 in., Top: 0 ft., Depth: 431 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 225, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 7381 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE1298 ft.
PARKMAN3629 ft.
SUSSEX4309 ft.
SHANNON4740 ft.
NIOBRARA6838 ft.
CODELL7170 ft.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 3/1/2024

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/19/1994Choke Size:2,264.000 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)484
Total Gas Produced (MCF)12832
GOR26512
GOR DeterminationMCFE
Average BOE per Day7.393
Average MCFE per Day42.872

 Federal Financial Assurance  i 

 Tribal Well  i No