|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/24/2017 Measured TD: 7529 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/24/2017 | | Wellbore Permit | | | Permit #: | 19920661 | Expiration Date: | 10/15/1992 | | Proposed Depth/Form: | 7500 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2NE |
| | |
| Wellbore Completed | | Completion Date: | 7/16/1992 | | Spud Date: | 6/30/1992 | Spud Date Is: | ACTUAL | | Measured TD: | 7529 ft. | Measured PB depth: | 7508 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMP.DENSITY, DIL, CCL-CBL-GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 672 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 672 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 2.875 in., Top: 0 ft., Depth: 7531 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 230, Top: 6646 ft., Bottom: 7531 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4575 ft. | | N | N | | NIOBRARA | 7085 ft. | | N | N | | CODELL | 7363 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 9/1/2011 Interval Top: 7363 ft. Interval Bottom: 7379 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/24/1992 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/11/2011 | | Treatment Summary: | Codell under sand plug for Niobrara refrac | | Formation Treatment | | Treatment Date: | 7/16/1992 | | Treatment Summary: | 66,135 GALS TERRA FRAC W/ 194,000# 20/40 SAND,8/24/1992. // ACIDIZE W/500 GAL 7.5% HCI; 66,135 GAL TERRA FRAC FLUID & 184,000# 20/40 SAND,7/16/1992. // 131,838 GAL VISTAR 28/26# GEL & 245,720# 20/40 OTTAWA SAND ON 4/19/02 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 12400 | | CALC_MCF_GAS | 310 | | CASING_PRESS | 2025 | | MCF_GAS | 310 |
| | Perforation Data: | | Interval Top: | 7363 ft. | # Of Holes: | 104 | | Interval Bottom: | 7379 ft. | Hole Size: | 0.32 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/24/2017 Interval Top: 7084 ft. Interval Bottom: 7379 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/7/2001 | Choke Size: | 0.218 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/16/1992 | | Treatment Summary: | COMMINGLED |
| | Tubing Size: | 1.25 in. | Tubing Setting Depth: | 7332 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/3/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 21 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 21 | | CALC_GOR | 23000 | | CALC_MCF_GAS | 486 | | CASING_PRESS | 510 | | MCF_GAS | 486 |
| | Perforation Data: | | Interval Top: | 7084 ft. | # Of Holes: | 94 | | Interval Bottom: | 7379 ft. | Hole Size: | 0.32 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 9/1/2011 Interval Top: 7084 ft. Interval Bottom: 7144 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/6/1996 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/11/2011 | | Treatment Summary: | Niobrara refrac
Frac'd Niobrara w/146118 gals Vistar, 15% HCl, and Slick Water with 247501 lbs Ottawa sand | | Formation Treatment | | Treatment Date: | 7/16/1992 | | Treatment Summary: | 56,000 GALS YF535 W/161,000# 20/40 SAND,6/6/1996.// ACIDIZE W/100 GAL 7.5% HCI 58,506 GAL FLUID & 161,000# 20/40 SAND, 5/31/96 // SQUEEZE W/ 30 BBLS MAGMA FIBER ON 4/15/2002 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/20/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 29 | | BBLS_OIL | 13 | | BTU_GAS | 1322 | | CALC_BBLS_H2O | 29 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 23385 | | CALC_MCF_GAS | 304 | | CASING_PRESS | 280 | | GRAVITY_OIL | 64 | | MCF_GAS | 304 |
| | Perforation Data: | | Interval Top: | 7084 ft. | # Of Holes: | 142 | | Interval Bottom: | 7144 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/24/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|