Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-15854
Well Classification: OW Status: PA - 5/20/2013
Well Name/No:WARDELL #H 18-01
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/20/2013
FacilityID:248056LocationID:328329
County:WELD #123Location:NENE 18 3N65W 6
Field:WATTENBERG - #90750Elevation:4930 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:657FNL  659 FELLat/Long: 40.230767 / -104.699198Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.230570 / -104.699070Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/9/2013             Measured TD: 7600 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/9/2013
Wellbore Permit
Permit #:19920660 Expiration Date:10/15/1992
Proposed Depth/Form:7500 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:7/25/1992
Measured TD:7600 ft.Measured PB depth:7420 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COMP, DEN, DIL, CCL, CBL, & GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 662 ft., Weight: 24.0 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 662 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 2.875 in., Top: , Depth: 7593 ft., Weight: 6.50 , Citings Type: ACTUAL
Cement:Sacks: 270, Top: 6650 ft., Bottom: 7593 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4468 ft.NN
NIOBRARA7052 ft.NN
CODELL7307 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  AB - 3/2/1971                  Interval Top: 7307 ft.    Interval Bottom: 7323 ft.

 Completed Information for Formation CODELL
1st Production Date:8/24/1992Choke Size:0.250 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/25/1992
Treatment Summary:109,620 GAL VISTAR 22/20 FJUID & 160,000# 20/40 SAND, 7/17/01
Tubing Size:1.25 in.Tubing Setting Depth:7291 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/14/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 10
CALC_BBLS_H2O 14
CALC_BBLS_OIL 10
CALC_GOR 19000
CALC_MCF_GAS 194
CASING_PRESS 500
MCF_GAS 194
TUBING_PRESS 225
Perforation Data:
Interval Top:7307 ft.# Of Holes:64
Interval Bottom:7323 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 3/2/1971                  Interval Top: 7054 ft.    Interval Bottom: 7319 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:6/24/1996Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/27/1996Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 6
CALC_BBLS_H2O 1
CALC_BBLS_OIL 6
CALC_GOR 16666
CALC_MCF_GAS 100
CASING_PRESS 1500
MCF_GAS 100
Perforation Data:
Interval Top:7054 ft.# Of Holes:62
Interval Bottom:7319 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 3/2/1971                  Interval Top: 7054 ft.    Interval Bottom: 7214 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/20/1996Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:7/25/1992
Treatment Summary:56,364 GALS YF500 HT W/161,000# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/1996Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 9
CALC_BBLS_H2O 4
CALC_BBLS_OIL 9
CALC_GOR 12777
CALC_MCF_GAS 115
CASING_PRESS 2100
MCF_GAS 115
Perforation Data:
Interval Top:7054 ft.# Of Holes:22
Interval Bottom:7214 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/20/2013
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No