|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/24/2025 Measured TD: 7925 ft. Vertical TD: 7925 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/24/2025 | | Wellbore Permit | | | Permit #: | 20040243 | Expiration Date: | 2/23/2005 | | Proposed Depth/Form: | 7950 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE |
| | |
| Wellbore Completed | | Completion Date: | 6/17/2004 | | Spud Date: | 8/5/1991 | Spud Date Is: | ACTUAL | | Measured TD: | 7925 ft. | Measured PB depth: | 7893 ft. | | True Vertical TD: | 7925 ft. | True Vertical PB depth: | 7893 ft. | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Log Types: | DIL, FDC, CBL | | Log Types: | CD, GR, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 509 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 509 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7459 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6483 ft., Bottom: 7459 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: 7414 ft., Depth: 7894 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 7431 ft., Bottom: 7894 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4260 ft. | | N | N | | NIOBRARA | 7016 ft. | | N | N | | FORT HAYS | 7315 ft. | | N | N | | CODELL | 7336 ft. | | N | N | | J SAND | 7783 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/24/2025 Interval Top: 7784 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 8/15/2004 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/17/2004 | | Treatment Summary: | 154,026 GAL FLUID; 4,000# 12/20 SAND; 115,940# 30/50 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7784 ft. | # Of Holes: | 132 | | Interval Bottom: | 7860 ft. | Hole Size: | 0.21 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/15/2025 Interval Top: 7055 ft. Interval Bottom: 7860 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 8/15/2004 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/17/2004 | | Treatment Summary: | COMMINGLED |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 1 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 112000 | | CALC_MCF_GAS | 112 | | CASING_PRESS | 319 | | GRAVITY_OIL | 59.6 | | MCF_GAS | 112 | | TUBING_PRESS | 207 |
| | Perforation Data: | | Interval Top: | 7055 ft. | # Of Holes: | 218 | | Interval Bottom: | 7860 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/24/2025 Interval Top: 7055 ft. Interval Bottom: 7354 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/28/1991 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/17/2004 | | Treatment Summary: | 7338-7354' ACIDIZE W/500 GAL 7.5% HCI; FRAC W/83,000 GAL 2% KCI WTR W/40# GUAR, W/10,000# 100 MESH SAND& 258,120# 20/40 MESH SAND. 7055-7200' ACIDIZE W/1000 GAL 7.5% HCI; FRAC W/71,040 GAL 2% KCI WTR W/40# GUAR W/10,000# 100 MESH SAND & 162,000# 20/40 MESH SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 78 | | CALC_BBLS_H2O | 71 | | CALC_BBLS_OIL | 139 | | CALC_GOR | 8667 | | CALC_MCF_GAS | 1202 | | CASING_PRESS | 540 | | MCF_GAS | 676 | | TUBING_PRESS | 280 |
| | Perforation Data: | | Interval Top: | 7055 ft. | # Of Holes: | 86 | | Interval Bottom: | 7354 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/24/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 139 |
| Total Gas Produced (MCF) | 7170 |
| GOR | 51582 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.792 |
| Average MCFE per Day | 21.981 |
| Federal Financial Assurance | i | |
|
|