Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14575
Well Classification: GW Status: PA - 5/12/2025
Well Name/No:SARCHET UPRR #42-23 3X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/12/2025
FacilityID:246778LocationID:336298
County:WELD #123Location:SENE 23 3N66W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1966FNL  576 FELLat/Long: 40.212437 / -104.737029Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.212485 / -104.736904Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 5/12/2025             Measured TD: 7541 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 5/12/2025
Wellbore PermitDIRECTIONAL
Permit #:19960726 Expiration Date:7/20/1990
Proposed Depth/Form:7565 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit:

Wellbore Completed
Completion Date:5/16/1990
Spud Date:4/24/1990Spud Date Is:ACTUAL
Measured TD:7541 ft.Measured PB depth:7502 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1739 FNL  774 FEL
Log Types:DIGL, DSN-CDL, GAMMA RAY, BOND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 670 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 670 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6750 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 6600 ft., Bottom: 6750 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.75 in., Size: 2.375 in., Top: 6659 ft., Depth: 7973 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 40, Top: 7020 ft., Bottom: 7973 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4604 ft.NN
NIOBRARA7142 ft.NN
FORT HAYS7380 ft.NN
CODELL7402 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 1/23/2025                 Interval Top: 7404 ft.    Interval Bottom: 7414 ft.

 Completed Information for Formation CODELL
1st Production Date:6/4/1990Choke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/16/1990
Treatment Summary:7404-7414' 24M# 100 MESH, 430M# 20/40 IN 2094 BBLS 40# GEL. ATP 3400# @ 18 BPM. ISDP 4260#. 5 MIN 4180#, 10 MIN 4180#, 15 MIN 4180#.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 49
CALC_BBLS_H2O 0
CALC_BBLS_OIL 49
CALC_GOR 10286
CALC_MCF_GAS 504
CASING_PRESS 2000
MCF_GAS 504
Perforation Data:
Interval Top:7404 ft.# Of Holes:20
Interval Bottom:7414 ft.Hole Size:0.375 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/12/2025                 Interval Top: 7148 ft.    Interval Bottom: 7414 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/15/2002Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/16/1990
Treatment Summary:SEE CODL. NBRR: 750 GAL 10% HCL & 77,940 GAL PUREGEL III W/5,000# 100 MESH & 196,000# 20/40 SAND. ISDP 4030#. // REFRAC NB-CD 6/4/02 W/261,380 #20/40 MESH & 90,469 GAL. GELLED FLUID.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 6
CALC_BBLS_OIL 6
CALC_GOR 13667
CALC_MCF_GAS 82
CASING_PRESS 510
GRAVITY_OIL 60
MCF_GAS 82
TUBING_PRESS 250
Perforation Data:
Interval Top:7148 ft.# Of Holes:39
Interval Bottom:7414 ft.Hole Size:0.375 in.

Sidetrack #01             Wellbore Classification:              Status: AB - 5/12/2025             Measured TD:

 Wellbore Data for Sidetrack #01Wellbore Classification:         AB - 5/12/2025
Wellbore Permit
Permit #:19960726 Expiration Date:10/16/1997
Proposed Depth/Form:7930 ft.
Surface Mineral Owner Same:
Mineral Owner:Surface Owner:
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:N/A
Spud Date:4/24/1990Spud Date Is:ACTUAL
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 5/12/2025

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/1/2001Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/1/2001
Treatment Summary:ALL INFORMATION UNDER SIDETRACK #00
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/12/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No