|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2022 Measured TD: 7541 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | 19960726 | Expiration Date: | 7/20/1990 | Proposed Depth/Form: | 7565 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 5/16/1990 | Spud Date: | 4/24/1990 | Spud Date Is: | ACTUAL | Measured TD: | 7541 ft. | Measured PB depth: | 7502 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Top PZ Location: | Sec: Twp: | Footage: 1739 FNL 774 FEL | Bottom Hole Location: | Sec: Twp: | Footage: 1288 N 1102 E | Log Types: | DIGL, DSN-CDL, GAMMA RAY, BOND | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 670 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 670 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6750 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 190, Top: 6600 ft., Bottom: 6750 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 3.75 in., Size: 2.375 in., Top: 6659 ft., Depth: 7973 ft., Weight: 6.5 , Citings Type: ACTUAL | Cement: | Sacks: 40, Top: 7020 ft., Bottom: 7973 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4604 ft. | | N | N | NIOBRARA | 7142 ft. | | N | N | FORT HAYS | 7380 ft. | | N | N | CODELL | 7402 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 7/15/2002 Interval Top: 7404 ft. Interval Bottom: 7414 ft. Completed Information for Formation CODELL | 1st Production Date: | 5/23/1990 | Choke Size: | 0.125 in. | Formation Name: | CODELL | Commingled: | | Production Method: | PLUNGER 500 | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/16/1990 | Treatment Summary: | 7404-7414' 24M# 100 MESH, 430M# 20/40 IN 2094 BBLS 40# GEL. ATP 3400# @ 18 BPM. ISDP 4260#. 5 MIN 4180#, 10 MIN 4180#, 15 MIN 4180#. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/4/1990 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 0 | BBLS_OIL | 49 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 49 | CALC_GOR | 10286 | CALC_MCF_GAS | 504 | CASING_PRESS | 2000 | MCF_GAS | 504 |
| Perforation Data: | Interval Top: | 7404 ft. | # Of Holes: | 20 | Interval Bottom: | 7414 ft. | Hole Size: | 0.375 in. |
|
Formation NB-CD Formation Classification: GW Status: CM - 7/15/2002 Interval Top: 7148 ft. Interval Bottom: 7414 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | 0.218 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | PLUNGER | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/16/1990 | Treatment Summary: | SEE CODL. NBRR: 750 GAL 10% HCL & 77,940 GAL PUREGEL III W/5,000# 100 MESH & 196,000# 20/40 SAND. ISDP 4030#. // REFRAC NB-CD 6/4/02 W/261,380 #20/40 MESH & 90,469 GAL. GELLED FLUID. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6627 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/15/2002 | Test Method: | PLUNGER | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 6 | CALC_BBLS_OIL | 6 | CALC_GOR | 13667 | CALC_MCF_GAS | 82 | CASING_PRESS | 510 | GRAVITY_OIL | 60 | MCF_GAS | 82 | TUBING_PRESS | 250 |
| Perforation Data: | Interval Top: | 7148 ft. | # Of Holes: | 39 | Interval Bottom: | 7414 ft. | Hole Size: | 0.375 in. |
|
Sidetrack #01 Wellbore Classification: Status: SI - 7/1/2020 Measured TD: Wellbore Data for Sidetrack #01 | Wellbore Classification: SI - 7/1/2020 | Wellbore Permit | | Permit #: | 19960726 | Expiration Date: | 10/16/1997 | Proposed Depth/Form: | 7930 ft. | Surface Mineral Owner Same: | | Mineral Owner: | | Surface Owner: | | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2NE |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 4/24/1990 | Spud Date Is: | ACTUAL | Measured TD: | | Measured PB depth: | | True Vertical TD: | | True Vertical PB depth: | |
Formation NB-CD Formation Classification: GW Status: SI - 7/1/2020 Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 8/1/2001 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/1/2001 | Treatment Summary: | ALL INFORMATION UNDER SIDETRACK #00 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2020 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|