Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14365
Well Classification: GW Status: PA - 9/11/2018
Well Name/No:HSR - STEER #15-33A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/11/2018
FacilityID:246568LocationID:327237
County:WELD #123Location:SWSE 33 3N66W 6
Field:WATTENBERG - #90750Elevation:4937 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FSL  1980 FELLat/Long: 40.176089 / -104.779775Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.176089 / -104.779775Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/11/2018             Measured TD: 7550 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/11/2018
Wellbore PermitDRIFTED
Permit #: Expiration Date:8/3/2012
Proposed Depth/Form:8004 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: S2SE4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 320, Drill Unit: S2S2SE4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 649 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 325, Top: 10 ft., Bottom: 649 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7543 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 6510 ft., Bottom: 7543 ft.
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 8004 ft., Weight: 6.5 , Citings Type: PLANNED
Cement:Sacks: 30, Top: 7468 ft., Bottom: 8004 ft.

Wellbore Completed
Completion Date:12/19/1989
Spud Date:7/29/1989Spud Date Is:ACTUAL
Measured TD:7550 ft.Measured PB depth:7503 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIGITAL SONIC LOG, BOND LOG, DIFL/GR, CNL/GR
Log Types:CBL DEN - NEUT IND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 649 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 649 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7543 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 6500 ft., Bottom: 7543 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 8004 ft., Weight: 6.5 , Citings Type: ACTUAL
Cement:Sacks: 30, Top: 7468 ft., Bottom: 8004 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7136 ft.NN
FORT HAYS7386 ft.NN
CODELL7408 ft.NN
GREENHORN7492 ft.NN
J SAND7846 ft.NN

Formation JSND                     Formation Classification:  OG                     Status:  AB - 9/11/2018                 Interval Top: 7848 ft.    Interval Bottom: 7900 ft.

 Completed Information for Formation J SAND
1st Production Date:10/11/1998Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/8/2013Treatment End Date:N/A
Treatment Summary:CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/8/2010
Treatment Summary:Set sand plug @ 7473'.
Formation Treatment
Treatment Date:12/19/1989
Treatment Summary:560,940# 20-40 MESH; 287,994 GALS GELLED FLUID
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7848 ft.# Of Holes:72
Interval Bottom:7900 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/25/2010                Interval Top: 7412 ft.    Interval Bottom: 7426 ft.

 Completed Information for Formation CODELL
1st Production Date:10/13/2010Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/21/2010
Treatment Summary:Reperf CODL 7412-7426 Holes 28 Size 0.38. Tri-frac CODL w/ 134,055 gal pHaser & 220,680# 30/50 sand & 4,000# SB Excel.
Formation Treatment
Treatment Date:12/19/1989
Treatment Summary:ORIGINAL COMPLETION: FRA'C DW/ 24,000# 100 MESH, 300,000# 20-40 MESH, 76,550 GALS GELLED FLUID. 11/98: CM'D W/ JSND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 35
CALC_BBLS_H2O 0
CALC_BBLS_OIL 35
CALC_GOR 2886
CALC_MCF_GAS 101
CASING_PRESS 1650
GRAVITY_OIL 60
MCF_GAS 101
TUBING_PRESS 850
Perforation Data:
Interval Top:7412 ft.# Of Holes:75
Interval Bottom:7426 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  OW                   Status:  CM - 11/25/1998                Interval Top: 7412 ft.    Interval Bottom: 7900 ft.

 Completed Information for Formation J-CODELL
1st Production Date:11/25/1998Choke Size:0.281 in.
Formation Name:J-CODELLCommingled:
Production Method:
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7427 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/1998Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 10
CALC_BBLS_H2O 0
CALC_BBLS_OIL 10
CALC_GOR 56600
CALC_MCF_GAS 566
CASING_PRESS 570
GRAVITY_OIL 60
MCF_GAS 566
TUBING_PRESS 400
Perforation Data:
Interval Top:7412 ft.# Of Holes:
Interval Bottom:7900 ft.Hole Size:

Formation JNBCD                   Formation Classification:  OG                   Status:  CM - 2/12/2013                 Interval Top: 7141 ft.    Interval Bottom: 7900 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:2/11/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/12/2013Treatment End Date:N/A
Treatment Summary:CLEARED OUT SAND PLUG TO COMMINGLE JSND PRODUCTION WITH NB/CD PRODUCTION.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7534 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/12/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 1
BTU_GAS 1274
CALC_BBLS_OIL 1
CALC_GOR 23000
CALC_MCF_GAS 23
CASING_PRESS 704
GRAVITY_OIL 49
MCF_GAS 23
TUBING_PRESS 667
Perforation Data:
Interval Top:7141 ft.# Of Holes:168
Interval Bottom:7900 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 9/11/2018                 Interval Top: 7141 ft.    Interval Bottom: 7426 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/13/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/21/2010
Treatment Summary:NBRR Perf 7141-7290 Holes 68 Size 0.38 CODL Perf 7412-7426 Holes 75 Size 0.38 Frac NBRR w/ 171,034 gal pHaser Hybrid & 250,840# 20/40 sand & 4,000# SB Excel.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/16/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 63
BTU_GAS 1219
CALC_BBLS_OIL 63
CALC_GOR 3810
CALC_MCF_GAS 240
CASING_PRESS 852
GRAVITY_OIL 51
MCF_GAS 240
Perforation Data:
Interval Top:7141 ft.# Of Holes:143
Interval Bottom:7426 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/11/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No