Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-14102
Well Classification: OW Status: PA - 8/21/2014
Well Name/No:DOLPH UPRR #42-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/21/2014
FacilityID:246305LocationID:336264
County:WELD #123Location:SENE 1 2N66W 6
Field:WATTENBERG - #90750Elevation:5017 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  660 FELLat/Long: 40.169097 / -104.718288Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.169260 / -104.718230Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/21/2014             Measured TD: 7570 ft.    Vertical TD: 7570 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/21/2014
Wellbore Permit
Permit #:19881054 Expiration Date:2/19/1989
Proposed Depth/Form:7380 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S2NE

Wellbore Completed
Completion Date:11/30/1988
Spud Date:11/11/1988Spud Date Is:ACTUAL
Measured TD:7570 ft.Measured PB depth:7342 ft.
True Vertical TD:7570 ft.True Vertical PB depth:
Log Types:DIGL,DSN-CDL, (WELEX) GAMMA RAY, BOND (BRAN-DE X)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 577 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 577 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 3.5 in., Top: , Depth: 7579 ft., Weight: 9.2 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 6406 ft., Bottom: 7579 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 849 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 198, Top: 0 ft., Bottom: 849 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4588 ft.NN
NIOBRARA7230 ft.NN
FORT HAYS7405 ft.NN
CODELL7428 ft.NN

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/21/2014                 Interval Top: 7274 ft.    Interval Bottom: 7429 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/19/1989Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:PLUNGER
Open Hole Completion:No
Formation Treatment
Treatment Date:11/30/1988
Treatment Summary:NOT REPERFORATED - 2/13/03 REFRAC CODL 0 #100 MESH 261440 # 20/40/MESH 89552 GAL. GELLED FLUID. TEST PRODUCTION REPRESENTS NB-CD FORMATIONS.
Tubing Size:2.0625 in.Tubing Setting Depth:7420 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/5/2003Test Method:PLUNGER
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 17
CALC_BBLS_H2O 0
CALC_BBLS_OIL 17
CALC_GOR 1706
CALC_MCF_GAS 29
CASING_PRESS 500
GRAVITY_OIL 60
MCF_GAS 29
TUBING_PRESS 400
Perforation Data:
Interval Top:7274 ft.# Of Holes:
Interval Bottom:7429 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/21/2014
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No