|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/11/2024 Measured TD: 7330 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/11/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 19870804 | Expiration Date: | 2/28/1988 | | Proposed Depth/Form: | 7330 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBCSX , Formation: NIOBRARA-CODELL-SUSSEX , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/28/1987 | | Spud Date: | 11/11/1987 | Spud Date Is: | ACTUAL | | Measured TD: | 7330 ft. | Measured PB depth: | 7199 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, FDC-GR, DIL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 316 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 316 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7330 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1500, Top: 3590 ft., Bottom: 7330 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4455 ft. | | N | N | | NIOBRARA | 6866 ft. | | N | N | | FORT HAYS | 7146 ft. | | N | N | | CODELL | 7169 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/16/2023 Interval Top: 7171 ft. Interval Bottom: 7185 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/16/2023 | Treatment End Date: | N/A | | Treatment Summary: | Nov 1987 7171 - 7183 7 holes;
7/12/2001 7171 - 7185 30 holes;
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7171 ft. | # Of Holes: | 37 | | Interval Bottom: | 7185 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/11/2024 Interval Top: 6891 ft. Interval Bottom: 7185 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/28/1987 | | Treatment Summary: | NBRR-CDL COMMINGLE. RELEASED RBP @ 7116' TO COMMINGLE THE NBRR-CDL. 06/22/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 4 | | BTU_GAS | 1339 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 36750 | | CALC_MCF_GAS | 147 | | CASING_PRESS | 475 | | GRAVITY_OIL | 60 | | MCF_GAS | 147 | | TUBING_PRESS | 111 |
| | Perforation Data: | | Interval Top: | 6891 ft. | # Of Holes: | 393 | | Interval Bottom: | 7185 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/7/2023 Interval Top: 6891 ft. Interval Bottom: 7100 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 11/16/2023 | Treatment End Date: | N/A | | Treatment Summary: | November 1987 perf 6891, 6904, 56, 61, 64, 7035, 37, 55, 57, 93 10 holes;
1/16/2004 perf 6910 - 6940, 7070 - 7100 120 holes;
5/21/2009 perf 6891 - 7100 226 holes
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 5/21/2009 | | Treatment Summary: | NBRR RECOMPLETION SET. RBP @ 7116'. 05/17/09. FRAC'D THE NIOBRARA WITH 191,478 GAL 26# TO 18# VISTAR CROSS LINKED GEL HYBRID CONTAINING 350,120# 30/50 SAND. 05/21/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 10 | | BTU_GAS | 1339 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 10 | | CALC_GOR | 19700 | | CALC_MCF_GAS | 197 | | CASING_PRESS | 205 | | GRAVITY_OIL | 60 | | MCF_GAS | 197 | | TUBING_PRESS | 280 |
| | Perforation Data: | | Interval Top: | 6891 ft. | # Of Holes: | 356 | | Interval Bottom: | 7100 ft. | Hole Size: | 0.38 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 6/7/2023 Interval Top: 4460 ft. Interval Bottom: 4515 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/28/1987 | | Treatment Summary: | 12/1/1992: FRAC'D W/270,000# 16/30 SAND & 16,000# 12/20 RESIN COATED SAND IN 85,400 GALS X-LINKED GEL. 7/6/01:SQUEEZED W/ 100 SXS CLASS G+2% CACL2 & 100 SXS CLASS G NEAT |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 9800 | | CALC_MCF_GAS | 49 | | CASING_PRESS | 380 | | MCF_GAS | 49 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 4460 ft. | # Of Holes: | | | Interval Bottom: | 4515 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/11/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|