Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-09690
Well Classification: OW Status: PA - 8/9/2017
Well Name/No:LEONARD #13-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/9/2017
FacilityID:241899LocationID:318683
County:WELD #123Location:NWSW 21 2N67W 6
Field:SPINDLE - #77900Elevation:5001 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FSL  660 FWLLat/Long: 40.121767 / -104.902883Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.121980 / -104.902670Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/18/2013
End Date: 3/18/2013
Reported: 4/1/2013
Days to report: 14
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/9/2017             Measured TD: 5200 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/9/2017
Wellbore Permit
Permit #:19790154 Expiration Date:6/28/1979
Proposed Depth/Form:5170 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit:

Wellbore Completed
Completion Date:6/7/1979
Spud Date:3/28/1979Spud Date Is:ACTUAL
Measured TD:5200 ft.Measured PB depth:5178 ft.
True Vertical TD:True Vertical PB depth:
Log Types:INDUCTION ELEC. COMP. DENSITY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 542 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 542 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5198 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 4123 ft., Bottom: 5198 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SUSSEX4610 ft.NN
BENTONITE4762 ft.NN
SHANNON5046 ft.NN

Formation SX-SN                   Formation Classification:  OW                   Status:  AB - 8/9/2017                  Interval Top: 4610 ft.    Interval Bottom: 5072 ft.

 Completed Information for Formation SUSSEX-SHANNON
1st Production Date:6/25/1979Choke Size: 
Formation Name:SUSSEX-SHANNONCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/18/2013Treatment End Date:3/18/2013
Treatment Summary:Acid pumpdown to remove scale. 12 bbls of acid pumped, 5 bbl flush. No new perforations.
Total fluid used in treatment (bbls):17Max pressure during treatment (psi):82
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.43
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):5Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/7/1979
Treatment Summary:5046'-5072': K1: 1,338 BO, 496 BW, 200,000# SD. 4610'-4660': K1: 1,798 BO, 760 BW, 298,000# SD
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/28/2013Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 12
BTU_GAS 1350
CALC_BBLS_H2O 6
CALC_BBLS_OIL 12
CALC_GOR 3750
CALC_MCF_GAS 45
CASING_PRESS 350
GRAVITY_OIL 41
MCF_GAS 45
TUBING_PRESS 180
Perforation Data:
Interval Top:4610 ft.# Of Holes:76
Interval Bottom:5072 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/09/2017
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No