|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/13/2024 Measured TD: 7956 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/13/2024 | | Wellbore Permit | DRIFTED | | Permit #: | 19760048 | Expiration Date: | 7/21/1997 | | Proposed Depth/Form: | 7956 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/27/1976 | Spud Date Is: | ACTUAL | | Measured TD: | 7956 ft. | Measured PB depth: | 7910 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES & FDC; CBL-VDL-GR-CCL | | Log Types: | IES & FDC | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 330 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 330 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7951 ft., Weight: 10.50 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 7108 ft., Bottom: 7951 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7082 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 6692 ft., Bottom: 7082 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 60 ft. | | N | N | | SUSSEX | 4278 ft. | | N | N | | SHANNON | 4726 ft. | | N | N | | NIOBRARA | 7132 ft. | | N | N | | CODELL | 7401 ft. | | N | N | | J SAND | 7825 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 2/13/2024 Interval Top: 7848 ft. Interval Bottom: 7862 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/26/1976 | Choke Size: | 0.312 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/22/1996 | | Treatment Summary: | 190,900 GALS VERSA FRAC, 93,600# 100 MESH, 201,600# 20-40, 100,000# 10-20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/28/1976 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 399 | | MCF_GAS | 399 | | TUBING_PRESS | 225 |
| | Perforation Data: | | Interval Top: | 7848 ft. | # Of Holes: | 20 | | Interval Bottom: | 7862 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: GW Status: AB - 2/13/2024 Interval Top: 7402 ft. Interval Bottom: 7420 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/6/1996 | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/22/1996 | | Treatment Summary: | 85,500 GALS MEDALLION FRAC 3500 LIIT/11C/D, CROSSLINKED GEL CONTAINING 8,080# MESH, 292,000# 20-40 SD, 8,340# 12/20 TEMPERED DC RESIN COATED SD. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7180 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/17/1996 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 24 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 3583 | | CALC_MCF_GAS | 86 | | MCF_GAS | 86 | | TUBING_PRESS | 140 |
| | Perforation Data: | | Interval Top: | 7402 ft. | # Of Holes: | 36 | | Interval Bottom: | 7420 ft. | Hole Size: | 3.125 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 10/22/1996 Interval Top: 7402 ft. Interval Bottom: 7862 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 10/22/1996 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7400 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/20/1996 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 6 | | BBLS_OIL | 20 | | CALC_BBLS_H2O | 6 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 550 | | CALC_MCF_GAS | 110 | | CASING_PRESS | 450 | | MCF_GAS | 110 | | TUBING_PRESS | 100 |
| | Perforation Data: | | Interval Top: | 7402 ft. | # Of Holes: | 56 | | Interval Bottom: | 7862 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 02/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|