|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/5/2016 Measured TD: 7830 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/5/2016 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 5/18/2012 | | Proposed Depth/Form: | 7835 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 210 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 210 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7833 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 6937 ft., Bottom: 7833 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 673 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 430 ft., Bottom: 673 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/2/1975 | | Spud Date: | 2/19/1975 | Spud Date Is: | ACTUAL | | Measured TD: | 7830 ft. | Measured PB depth: | 7762 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL-GR-CCL run 7/21/10 for cement squeeze | | Log Types: | SP-IES & FCD - GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 208 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 208 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7831 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6937 ft., Bottom: 7831 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6910 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 6222 ft., Bottom: 6910 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1670 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 1640 ft., Bottom: 1900 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 669 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 430 ft., Bottom: 669 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 890 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 545, Top: 103 ft., Bottom: 1010 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 587 ft. | | | | | SUSSEX | 4350 ft. | | | | | SHANNON | 5010 ft. | | | | | NIOBRARA | 6940 ft. | | | | | CODELL | 7230 ft. | | | | | J SAND | 7687 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 7/5/2016 Interval Top: 7687 ft. Interval Bottom: 7719 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/27/1996 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2010 | | Treatment Summary: | Set sand plug @ 7100'. | | Formation Treatment | | Treatment Date: | 4/8/1975 | | Treatment Summary: | SEE SCANNED DOCUMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 22 | | CALC_GOR | 35454 | | CASING_PRESS | 800 | | GRAVITY_OIL | 60 | | MCF_GAS | 780 |
| | Perforation Data: | | Interval Top: | 7687 ft. | # Of Holes: | 24 | | Interval Bottom: | 7719 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: OW Status: CM - 4/27/1999 Interval Top: 7230 ft. Interval Bottom: 7248 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/27/1996 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/9/2010 | | Treatment Summary: | Refrac CODL w/ 119,570 gal Dynaflow 2 & 261,080# 20/40 sand & 4,000# SuperLC. | | Formation Treatment | | Treatment Date: | 4/8/1975 | | Treatment Summary: | SEE SCANNED DOCUMENTS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 65 | | CALC_GOR | 1092.31 | | CASING_PRESS | 1485 | | MCF_GAS | 71 | | TUBING_PRESS | 890 |
| | Perforation Data: | | Interval Top: | 7230 ft. | # Of Holes: | 72 | | Interval Bottom: | 7248 ft. | Hole Size: | 0.375 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 2/12/1998 Interval Top: 7230 ft. Interval Bottom: 7719 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 2/5/1997 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7675 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/5/1997 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1 | | BBLS_OIL | 3 | | CALC_GOR | 5000 | | MCF_GAS | 15 |
| | Perforation Data: | | Interval Top: | 7230 ft. | # Of Holes: | 96 | | Interval Bottom: | 7719 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/5/2016 Interval Top: 7006 ft. Interval Bottom: 7092 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/9/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/29/2010 | | Treatment Summary: | NBRR Perf 7006-7092 Holes 40 Size 0.42 CODL Perf 7230-7248 Holes 72 Size 0.38 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/14/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 15 | | BTU_GAS | 1152 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 8333 | | CALC_MCF_GAS | 125 | | CASING_PRESS | 750 | | GRAVITY_OIL | 48 | | MCF_GAS | 125 |
| | Perforation Data: | | Interval Top: | 7006 ft. | # Of Holes: | 112 | | Interval Bottom: | 7092 ft. | Hole Size: | 0.375 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 12/2/2010 Interval Top: 7006 ft. Interval Bottom: 7092 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/9/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/29/2010 | | Treatment Summary: | Frac NBRR w/ 252 gal 15% HCl & 161,524 gal Dynaflow 2 Hybrid & 250,060# 20/40 sand & 4,000# SuperLC. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7006 ft. | # Of Holes: | 40 | | Interval Bottom: | 7092 ft. | Hole Size: | 0.4285714 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/05/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|