|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/23/2018 Measured TD: 7911 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/23/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 19761349 | Expiration Date: | 4/21/1993 | | Proposed Depth/Form: | 8000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 4/4/1977 | | Spud Date: | 3/30/1977 | Spud Date Is: | ACTUAL | | Measured TD: | 7911 ft. | Measured PB depth: | 7858 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES, FEL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 547 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 547 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7900 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 7002 ft., Bottom: 7900 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6990 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 115, Top: 6610 ft., Bottom: 6990 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4420 ft. | | N | N | | NIOBRARA | 6995 ft. | | N | N | | FORT HAYS | 7270 ft. | | N | N | | CODELL | 7302 ft. | | N | N | | J SAND | 7742 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 3/23/2018 Interval Top: 7443 ft. Interval Bottom: 7810 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/5/1977 | Choke Size: | 0.500 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/4/1977 | | Treatment Summary: | 7743-7810' 4,588 BBLS YF4G FLUID W/515,000# SAND, 1977. // ISOLATED WITH CIBP SET @ 7700', DUMP SAND ON CIBP, TOP OF SAND IS 7482', 9/6/2002. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7707 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/13/1977 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 16 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 100000 | | CALC_MCF_GAS | 1600 | | CASING_PRESS | 325 | | MCF_GAS | 1600 |
| | Perforation Data: | | Interval Top: | 7443 ft. | # Of Holes: | 57 | | Interval Bottom: | 7810 ft. | Hole Size: | 0.37 in. |
|
Formation CODL Formation Classification: OW Status: CM - 2/7/2008 Interval Top: 7303 ft. Interval Bottom: 7327 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/4/1977 | | Treatment Summary: | CODELL IS UNDER SAND PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 40 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 69 | | CALC_GOR | 2362 | | CALC_MCF_GAS | 163 | | CASING_PRESS | 1000 | | MCF_GAS | 95 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 7303 ft. | # Of Holes: | 96 | | Interval Bottom: | 7327 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OW Status: CM - 4/21/2009 Interval Top: 7034 ft. Interval Bottom: 7810 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | 0.313 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/4/1977 | | Treatment Summary: | COMMINGLE J-SAND, NIOBRARA & CODELL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7728 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/21/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 16 | | BTU_GAS | 1257 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 16 | | CALC_GOR | 28188 | | CALC_MCF_GAS | 451 | | CASING_PRESS | 550 | | GRAVITY_OIL | 50 | | MCF_GAS | 451 | | TUBING_PRESS | 280 |
| | Perforation Data: | | Interval Top: | 7034 ft. | # Of Holes: | 281 | | Interval Bottom: | 7810 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 2/27/2009 Interval Top: 7034 ft. Interval Bottom: 7100 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/14/2009 | Choke Size: | 0.375 in. | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/13/2009 | | Treatment Summary: | FRAC'D NIOBRARA WITH 171,948 GALS OF SILVERSTIM AND SLICKWATER WITH 249,500 LBS OF OTTAWA SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/27/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 15 | | BTU_GAS | 1235 | | CALC_BBLS_H2O | 2 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 4533 | | CALC_MCF_GAS | 68 | | CASING_PRESS | 1000 | | GRAVITY_OIL | 50 | | MCF_GAS | 68 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 7034 ft. | # Of Holes: | 128 | | Interval Bottom: | 7100 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/23/2018| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/14/2009 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/23/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|