Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07939
Well Classification: OW Status: PA - 6/29/2016
Well Name/No:ANDERSON FAMILY TRUST C #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/29/2016
FacilityID:240151LocationID:336097
County:WELD #123Location:SWNE 34 3N68W 6
Field:WATTENBERG - #90750Elevation:4938 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1550FNL  1450 FELLat/Long: 40.185336 / -104.984846Lat/Long Source: Calculated From Footages
As Drilled Location:1518 FNL  1443 FELLat/Long: 40.185512 / -104.984774Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/29/2016             Measured TD: 7825 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/29/2016
Wellbore Permit
Permit #:19730948 Expiration Date:3/15/1974
Proposed Depth/Form:7995 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2

Wellbore Completed
Completion Date:N/A
Spud Date:11/16/1974Spud Date Is:ACTUAL
Measured TD:7825 ft.Measured PB depth:7772 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES, FDC-GR CALIPER
Log Types:compensated density GR, Induction, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 208 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 208 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7840 ft., Weight: 10.5/11.6, Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6950 ft., Bottom: 7840 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4444 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 3640 ft., Bottom: 4444 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1164 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 118 ft., Bottom: 1164 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4010 ft.4270 ft.NN
SHANNON4600 ft.5400 ft.NN
NIOBRARA6970 ft.7222 ft.NN
CODELL7244 ft.7266 ft.NN
J SAND7670 ft.7702 ft.NN

Formation JSND                     Formation Classification:  OG                     Status:  AB - 6/29/2016                 Interval Top: 7680 ft.    Interval Bottom: 7702 ft.

 Completed Information for Formation J SAND
1st Production Date:12/13/1974Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/2011
Treatment Summary:REMOVED SAND PLUG ON 1/11/2011. CLEANOUT F/ 7430' T/ 7785 PBMD , CIRC HOLE CLEAN W/ N2 / PU 13 STNDS. COMMINGLED WITH CODL ON 1/20/2011.
Formation Treatment
Treatment Date:1/12/1975
Treatment Summary:282702 GAL 79800# SN; 403200# 20/40 SN; 115300# SN
Tubing Size:2.375 in.Tubing Setting Depth:7630 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/18/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 4
BTU_GAS 1271
CALC_BBLS_H2O 1
CALC_BBLS_OIL 4
CALC_GOR 105750
CALC_MCF_GAS 7
CASING_PRESS 719
GRAVITY_OIL 60
MCF_GAS 7
TUBING_PRESS 323
Perforation Data:
Interval Top:7680 ft.# Of Holes:22
Interval Bottom:7702 ft.Hole Size:0.36 in.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 6/29/2016                 Interval Top: 7244 ft.    Interval Bottom: 7266 ft.

 Completed Information for Formation CODELL
1st Production Date:12/6/1995Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:1/12/1975
Treatment Summary:DIVERTAFRAQC; PUMPED 71 BBLS OF GEL AND 215 BBLS OF FEL 2/ 4500#OF 20/40 SN, FLUSH 102 BBLS OF GEL CODELL FRAC: PUJMPED 381 BBLS OF GEL AND 337 BBLS OF GEL W/ 250000# 20/40. FLUSH W/ 29 BBLS 2%KCL, MAX PSI 6650, MAX RATE 16.4 BPM // CODELL 123373 GAL FLUID 261380 LBS 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7215 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/22/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 9
CALC_BBLS_H2O 0
CALC_BBLS_OIL 9
CALC_GOR 4778
CALC_MCF_GAS 43
CASING_PRESS 950
GRAVITY_OIL 48
MCF_GAS 43
TUBING_PRESS 650
Perforation Data:
Interval Top:7244 ft.# Of Holes:88
Interval Bottom:7266 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 6/29/2016                 Interval Top: 7244 ft.    Interval Bottom: 7702 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:1/12/1975
Treatment Summary:COMINGLED
Tubing Size:2.375 in.Tubing Setting Depth:7642 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/23/1998Test Method:FLOWING
Hours Tested:8Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 6
CALC_BBLS_H2O 0
CALC_BBLS_OIL 18
CALC_GOR 44333
CALC_MCF_GAS 798
CASING_PRESS 275
GRAVITY_OIL 60
MCF_GAS 798
TUBING_PRESS 225
Perforation Data:
Interval Top:7244 ft.# Of Holes:
Interval Bottom:7702 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/29/2016
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No