Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-12607
Well Classification: OW Status: PR - 10/30/2025
Well Name/No:ELU A18 FED #11C-18-495
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC062802
Facility Status:PRStatus Date10/30/2025
FacilityID:484047LocationID:483521
County:RIO BLANCO #103Location:3 18 4S95W 6
Field:GRAND VALLEY - #31290Elevation:8034 ft.
Basin:PICEANCE BASIN  
Planned Location:242FNL  850 FWLLat/Long: 39.709003 / -108.104652Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/5/2025
End Date: 8/9/2025
Reported: 9/22/2025
Days to report: 44
Disclosure: Sidetrack #00
Start Date: 10/5/2025
End Date: 10/8/2025
Reported: 11/5/2025
Days to report: 28
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification:              Status: PR - 10/1/2025             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification:         PR - 10/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/13/2025
Proposed Top PZ Location:Sec:18 Twp: 4S 95W Footage: 913 FNL  1741 FEL
Bottom Hole Location:Sec:18 Twp: 4S 95W Footage: 958 FNL  1814 FEL
Proposed Depth/Form:13528 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:Ex Liberty Unit Unit Number:COC069926X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: 94# , Citings Type: PLANNED
Cement:Sacks: 221, Top: 0 ft., Bottom: 120 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 711, Top: 900 ft., Bottom: 3000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 13945 ft., Weight: 13.5# , Citings Type: PLANNED
Cement:Sacks: 1725, Top: 4000 ft., Bottom: 13945 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: , Depth: 900 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 201, Top: 0 ft., Bottom: 900 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:10/30/2024Spud Date Is:NOTICE
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:18 Twp: 4S 95WFootage: 913 FNL  1741 FEL

Formation WFOCCM                 Formation Classification:  OW                 Status:  PR - 10/30/2025                Interval Top: 9330 ft.    Interval Bottom: 13149 ft.

 Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO
1st Production Date:10/30/2025Choke Size: 
Formation Name:WILLIAMS FORK-OHIO CREEK-CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:8/5/2025Treatment End Date:10/9/2025
Treatment Summary:15 Stages Plug Perf, 230,858 bbls recycled water, 57,714 bbls freshwater,179 bbls 7.5% HCI acid
Total fluid used in treatment (bbls):288751Max pressure during treatment (psi):7977
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.41
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):179Min frac gradient (psi/ft):0.59
Recycled water used in treatment (bbls):230858Total flowback volume recovered (bbls):14170
Fresh water used in treatment (bbls):57714Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2025Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1518
BTU_GAS 1094
CALC_BBLS_H2O 1518
CALC_MCF_GAS 1686
CASING_PRESS 4044
MCF_GAS 1686
Perforation Data:
Interval Top:9330 ft.# Of Holes:423
Interval Bottom:13149 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)140
Total Gas Produced (MCF)84347
GOR602478
GOR DeterminationMCFE
Average BOE per Day40.733
Average MCFE per Day236.259

 Federal Financial Assurance  i Y

 Tribal Well  i No