Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-12595
Well Classification: OW Status: PR - 10/30/2025
Well Name/No:FEDERAL #RG 23-13-298
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC0003453
Facility Status:PRStatus Date10/30/2025
FacilityID:483241LocationID:482958
County:RIO BLANCO #103Location:Lot 4 13 2S98W 6
Field:SULPHUR CREEK - #80090Elevation:6618 ft.
Basin:PICEANCE BASIN  
Planned Location:1110FNL  904 FWLLat/Long: 39.882127 / -108.346538Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.882125 / -108.346538Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/1/2025
End Date: 5/12/2025
Reported: 6/18/2025
Days to report: 37
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2025             Measured TD: 11910 ft.    Vertical TD: 11628 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/6/2025
Proposed Top PZ Location:Sec:13 Twp: 2S 98W Footage: 2562 FSL  1607 FWL
Bottom Hole Location:Sec:13 Twp: 2S 98W Footage: 2562 FNL  1607 FWL
Proposed Depth/Form:11916 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1359 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 444, Top: 0 ft., Bottom: 1359 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3150 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 157, Top: 2126 ft., Bottom: 3150 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11916 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 992, Top: 6381 ft., Bottom: 11916 ft.

Wellbore Completed
Completion Date:3/3/2025
Spud Date:8/21/2024Spud Date Is:ACTUAL
Measured TD:11910 ft.Measured PB depth:11865 ft.
True Vertical TD:11628 ft.True Vertical PB depth:11583 ft.
Top PZ Location:Sec:13 Twp: 2 98Footage: 2672 FSL  1608 FWL
Bottom Hole Location:Sec:13 Twp: 2 98Footage: 2488 FSL  1540 FWL
Log Types:CBL, (RES on 05-103-12596)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 82 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 194, Top: 0 ft., Bottom: 82 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1367 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 555, Top: 0 ft., Bottom: 1367 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3152 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 303, Top: 1297 ft., Bottom: 3152 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11910 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1978, Top: 2760 ft., Bottom: 11910 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER894 ft.
WASATCH2641 ft.
WASATCH G4728 ft.
OHIO CREEK6585 ft.
WILLIAMS FORK7443 ft.
CAMEO9957 ft.
ILES10446 ft.
ROLLINS10446 ft.
COZZETTE10599 ft.
CORCORAN10916 ft.
SEGO11149 ft.

Formation SEGO                     Formation Classification:  OW                     Status:  PR - 10/30/2025                Interval Top: 11149 ft.    Interval Bottom: 11826 ft.

 Completed Information for Formation SEGO
1st Production Date:6/17/2025Choke Size: 
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/1/2025Treatment End Date:5/12/2025
Treatment Summary:Iles Member
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:11149 ft.# Of Holes:95
Interval Bottom:11826 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  OW                   Status:  PR - 10/30/2025                Interval Top: 10916 ft.    Interval Bottom: 11148 ft.

 Completed Information for Formation CORCORAN
1st Production Date:6/17/2025Choke Size: 
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/1/2025Treatment End Date:5/12/2025
Treatment Summary:Iles Member
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:10916 ft.# Of Holes:29
Interval Bottom:11148 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  OW                     Status:  PR - 10/30/2025                Interval Top: 10612 ft.    Interval Bottom: 10915 ft.

 Completed Information for Formation COZZETTE
1st Production Date:6/17/2025Choke Size: 
Formation Name:COZZETTECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/1/2025Treatment End Date:5/12/2025
Treatment Summary:Iles Member
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:10612 ft.# Of Holes:44
Interval Bottom:10915 ft.Hole Size:0.35 in.

Formation WFCCCS                 Formation Classification:  OW                 Status:  CM - 6/17/2025                 Interval Top: 7986 ft.    Interval Bottom: 11826 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO
1st Production Date:6/17/2025Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/1/2025Treatment End Date:5/12/2025
Treatment Summary:258,806 bbls of Slickwater; 2,973 gals ( 71 bbls) of Biocide;
Total fluid used in treatment (bbls):258877Max pressure during treatment (psi):6827
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):258806Total flowback volume recovered (bbls):83908
Fresh water used in treatment (bbls):71Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:11440 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/17/2025Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1090
CALC_MCF_GAS 5500
CASING_PRESS 2878
MCF_GAS 5500
TUBING_PRESS 2650
Perforation Data:
Interval Top:7986 ft.# Of Holes:480
Interval Bottom:11826 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 10/30/2025                Interval Top: 7986 ft.    Interval Bottom: 10395 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/17/2025Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:5/1/2025Treatment End Date:5/12/2025
Treatment Summary:Williams Fork: 7986' - 9956' with 248 holes Cameo: 9957' - 10395' with 64 holes
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7986 ft.# Of Holes:312
Interval Bottom:10395 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)595
Total Gas Produced (MCF)235985
GOR396613
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No