Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10041
Well Classification: GW Status: SI - 3/1/2020
Well Name/No:WRD FEDERAL #19-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KT RESOURCES LLC - 10775
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:C-0127535
Facility Status:SIStatus Date3/1/2020
FacilityID:257850LocationID:336451
County:RIO BLANCO #103Location:SWNW 19 2N96W 6
Field:WHITE RIVER - #92800Elevation:6064 ft.
Basin:PICEANCE BASIN  
Planned Location:2030FNL  813 FWLLat/Long: 40.129209 / -108.214266Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.129085 / -108.214340Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 3/1/2020             Measured TD: 6970 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 3/1/2020
Wellbore Permit
Permit #:011511 Expiration Date:8/7/2002
Proposed Depth/Form:8000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/1/2001
Spud Date:9/13/2001Spud Date Is:ACTUAL
Measured TD:6970 ft.Measured PB depth:6917 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR - DSN - SDC - CNL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 1132 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 479, Top: 0 ft., Bottom: 1132 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6970 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 875, Top: 2142 ft., Bottom: 6970 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.2990 ft.NN
OHIO CREEK2990 ft.3814 ft.NN
WILLIAMS FORK3814 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 3/1/2020                  Interval Top: 6034 ft.    Interval Bottom: 6754 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size:0.500 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/1/2001
Treatment Summary:6680-6754', FRACED W/7700# 100 MESH, 104,000# 20/40 WHITE SAND, 6000# FLEXSAND 8/14 MESH. 6520-6602', FRACED W/100 265# WHITE SAND, 6754# FLEXSAND 8/14 MESH, 6152-6300'; FRACED W/85,265# 20/40 SAND, 6475# FLEXSAND 8/14 MESH. 6034-6080'; FRACED W/5200#
Tubing Size:2.375 in.Tubing Setting Depth:6875 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/7/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 0
CASING_PRESS 1600
MCF_GAS 302
TUBING_PRESS 1600
Perforation Data:
Interval Top:6034 ft.# Of Holes:124
Interval Bottom:6754 ft.Hole Size:3 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/23/2025
Defined Inactive (SI)YLast Production
02/29/2020
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No