Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/27/2024 | Treatment End Date: | 8/27/2024 |
Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 35 bbls fresh water |
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 1700 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/14/2023 | Treatment End Date: | 11/14/2023 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) WITH 15% HCL w/SOLVENT AND 40 BBLS OF WATER. |
Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 2528 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/7/2022 | Treatment End Date: | 11/7/2022 |
Treatment Summary: | PUMED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS WATER
|
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2450 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/7/2022 | Treatment End Date: | 4/7/2022 |
Treatment Summary: | PUMED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 40 BBLS WATER |
Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 7/14/2021 | Treatment End Date: | 7/14/2021 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 45 BBLS WATER
|
Total fluid used in treatment (bbls): | 92 | Max pressure during treatment (psi): | 2100 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 1/28/2020 | Treatment End Date: | N/A |
Treatment Summary: | Wellwork to change out 188 joints tubing and packer. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/19/2019 | Treatment End Date: | 12/19/2019 |
Treatment Summary: | WELL WORK TO CLEANOUT, INSTALL TIEBACK LINER, RE-PERFORATE (6262' TO 6270' AND 6287' TO 6300') , ACIDIZE (PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH 110 BBLS WATER).
|
Total fluid used in treatment (bbls): | 205 | Max pressure during treatment (psi): | 1800 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 110 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/10/2018 | Treatment End Date: | 4/10/2018 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL WITH 100 BBLS WATER AT 0.6 BPM AT 1400 PSI. |
Total fluid used in treatment (bbls): | 195 | Max pressure during treatment (psi): | 1400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 100 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 12/7/2017 | Treatment End Date: | N/A |
Treatment Summary: | High casing pressure was found on UP56-21 and the well was shut in. Well work has been completed, fiberlined tubing and packer were replaced. The top packer was set at 5970' and the tubing landed at 6480.7. A COGCC witnessed MIT is scheduled for November 30th. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 6/28/2017 | Treatment End Date: | N/A |
Treatment Summary: | Tubing plug was set at 5999' on 8/1/2016. Well was converted to gas injection 11/24/1954, converted back to production 2/23/1961, converted back to injection 11/21/1974. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 4/15/2010 |
Treatment Summary: | ACID STIMULATION 4/15/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 6480'. AT STARTING 2.8 BPM @ 25800 PSI. |