| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/22/2025 | Treatment End Date: | 8/22/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 bbls) 15% HCL w/SOLVENT AND 35 BBLS FRESH WATER, 0 BBLS RECYCLED.
CONVERTED TO INJECTION 06/03/1969 |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 7/29/2025 | Treatment End Date: | N/A |
| Treatment Summary: | UIC Failure post workover, well was shut in for high casing pressure. Pulled top packer, ran new top packer with FL injection string. Return to injection upon approval of a Form 21.
CONVERTED TO INJECTION 06/03/1969 |
| Total fluid used in treatment (bbls): | 410 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 407 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 402 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 7/24/2025 | Treatment End Date: | N/A |
| Treatment Summary: | UIC Failure post workover, well failed MIT pretest decided to run 5.5" tie back liner from 5801 feet to surface. Return to injection upon approval of a Form 21.
CONVERTED TO INJECTION 06/03/1969 |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/17/2025 | Treatment End Date: | 4/17/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS WATER
CONVERTED TO INJECTIN 06/03/1969 |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 8/10/2023 | Treatment End Date: | N/A |
| Treatment Summary: | Rig work to attempt to fish SIE equipment, only got out top swellable pkr and top SIE packer, retested with a RBP and received a passing MIT, upgraded WH and RIH w/ new injection equipment . Return to injection pending an approved form 21.
CONVERTED TO INJECTION 06/1969 |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 12/16/2009 |
| Treatment Summary: | ACID STIMULATION 12/16/09 PUMPED 4000 GALS 20% HCI DOWN TUBING |