Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05633
Well Classification: ERIW Status: IJ - 6/1/2025
Well Name/No:FEE #8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date6/1/2025
FacilityID:228669LocationID:314405
County:RIO BLANCO #103Location:NESE 29 2N102W 6
Field:RANGELY - #72370Elevation:5258 ft.
Basin:PICEANCE BASIN  
Planned Location:1980FSL  800 FELLat/Long: 40.112180 / -108.860531Lat/Long Source: Calculated From Footages
As Drilled Location:1980 FSL  800 FELLat/Long: 40.112264 / -108.860653Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 6/1/2025             Measured TD: 6358 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 6/1/2025
Wellbore Permit
Permit #:10001 Expiration Date:2/22/1946
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:1/15/1946
Spud Date:10/7/1945Spud Date Is:ACTUAL
Measured TD:6358 ft.Measured PB depth:6358 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CEMENT BOND LOG
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 51 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 10.75 in., Top: 0 ft., Depth: 1040 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 253, Top: , Bottom: , Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5616 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 2080 ft., Bottom: 5616 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 5616 ft., Bottom: 6358 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
DAKOTA3034 ft.
MORRISON3130 ft.
CURTIS3780 ft.
ENTRADA3910 ft.
CARMEL4060 ft.
NAVAJO4110 ft.
CHINLE4710 ft.
SHINARUMP4835 ft.
MOENKOPI4930 ft.
WEBER5575 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 6/1/2025                  Interval Top: 5620 ft.    Interval Bottom: 6358 ft.

 Completed Information for Formation WEBER
1st Production Date:5/12/2010Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/1/2025Treatment End Date:N/A
Treatment Summary:10/24 - UIC repair, unable to rel top pkr, backed off tbg, and cut over pkr, jarred free and LD, make CO run to btm pkr, tst csg - good, upgrade wellhead, RIH w/ new TOP pkr and circ pkr fluid, RDMO. Return well to injection pending an approved form 21. Converted to injection 05-12-2010
Total fluid used in treatment (bbls):1580Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):1580Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):1360Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/27/2024Treatment End Date:3/27/2024
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 35 bbls Fresh water. Converted to injection 05-12-2010
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/12/2010
Treatment Summary:PULLED PRODUCTION EQUIPMENT. CLEAN OUT WELLBORE, RAN NEW FIBERLINED TUBING WAITING ON APPROVAL ON FORM 31
Tubing Size:2.875 in.Tubing Setting Depth:5910 ft.
Tubing Packer Depth:5509 ft.Tubing Multiple Packer:
Open Hole Top:5620 ft.Open Hole Bottom:6358 ft.
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
GRAVITY_OIL 34
Perforation Data:
Interval Top:5620 ft.# Of Holes:
Interval Bottom:6358 ft.Hole Size:
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
04/30/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No