|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: IJ - 6/1/2025 Measured TD: 6358 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DSPW IJ - 6/1/2025 | | Wellbore Permit | | | Permit #: | 10001 | Expiration Date: | 2/22/1946 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/15/1946 | | Spud Date: | 10/7/1945 | Spud Date Is: | ACTUAL | | Measured TD: | 6358 ft. | Measured PB depth: | 6358 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CEMENT BOND LOG | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 51 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 10.75 in., Top: 0 ft., Depth: 1040 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 253, Top: , Bottom: , Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5616 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1250, Top: 2080 ft., Bottom: 5616 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 5616 ft., Bottom: 6358 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | DAKOTA | 3034 ft. | | | | | MORRISON | 3130 ft. | | | | | CURTIS | 3780 ft. | | | | | ENTRADA | 3910 ft. | | | | | CARMEL | 4060 ft. | | | | | NAVAJO | 4110 ft. | | | | | CHINLE | 4710 ft. | | | | | SHINARUMP | 4835 ft. | | | | | MOENKOPI | 4930 ft. | | | | | WEBER | 5575 ft. | | | |
Formation WEBR Formation Classification: ERIW Status: IJ - 6/1/2025 Interval Top: 5620 ft. Interval Bottom: 6358 ft.| Completed Information for Formation WEBER | | 1st Production Date: | 5/12/2010 | Choke Size: | | | Formation Name: | WEBER | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/1/2025 | Treatment End Date: | N/A | | Treatment Summary: | 10/24 - UIC repair, unable to rel top pkr, backed off tbg, and cut over pkr, jarred free and LD, make CO run to btm pkr, tst csg - good, upgrade wellhead, RIH w/ new TOP pkr and circ pkr fluid, RDMO. Return well to injection pending an approved form 21.
Converted to injection 05-12-2010 | | Total fluid used in treatment (bbls): | 1580 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 1580 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 1360 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 3/27/2024 | Treatment End Date: | 3/27/2024 | | Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 35 bbls Fresh water.
Converted to injection 05-12-2010 | | Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 5/12/2010 | | Treatment Summary: | PULLED PRODUCTION EQUIPMENT. CLEAN OUT WELLBORE, RAN NEW FIBERLINED TUBING WAITING ON APPROVAL ON FORM 31 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5910 ft. | | Tubing Packer Depth: | 5509 ft. | Tubing Multiple Packer: | | | Open Hole Top: | 5620 ft. | Open Hole Bottom: | 6358 ft. | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| GRAVITY_OIL | 34 |
| | Perforation Data: | | Interval Top: | 5620 ft. | # Of Holes: | | | Interval Bottom: | 6358 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Defined Inactive 04/30/2023 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|