|
|
|
|
Wellbore #00 Wellbore Classification: STOW Status: AC - 8/12/2014 Measured TD: 5257 ft. Wellbore Data for Original Wellbore | Wellbore Classification: STOW AC - 8/12/2014 | Wellbore Permit | | Permit #: | | Expiration Date: | 6/19/2014 | Prop Depth/Form: | 5260 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 450, Top: 0 ft., Bottom: 1200 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5260 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 40, Top: 4850 ft., Bottom: 5260 ft. | Casing: | String Type: S.C. 1.1, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: , Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 4450 ft., Bottom: 4850 ft. |
| | |
Wellbore Completed | Completion Date: | 11/10/2012 | Spud Date: | 10/16/2012 | Spud Date Is: | ACTUAL | Measured TD: | 5257 ft. | Measured PB depth: | 5218 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL
MUD
CALIPER
INDUCTION
TRIPLE COMBO
| Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1242 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 830, Top: 0 ft., Bottom: 1242 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5250 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 130, Top: 3920 ft., Bottom: 5250 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | GRANEROS | 5046 ft. | | N | N | D SAND | 5140 ft. | | N | N | HUNTSMAN | 5192 ft. | | N | N |
Formation DSND Formation Classification: STOW Status: AC - 8/12/2014 Interval Top: 5155 ft. Interval Bottom: 5185 ft. Completed Information for Formation D SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | D SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 11/8/2016 | Treatment End Date: | N/A | Treatment Summary: | Objective of well rework was to drill out CIBP set between two sets of perforations. CIBP was located at 5170 ft with upper perforations at 5155 to 5169 feet and lower perforations at 5172-5185 feet. No treatment or fracture stimulation was done on the well. | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 4.5 in. | Tubing Setting Depth: | 5092 ft. | Tubing Packer Depth: | 5005 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DSND. |
| Perforation Data: | Interval Top: | 5155 ft. | # Of Holes: | 162 | Interval Bottom: | 5185 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|