|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: DSPW Status: EP - 2/4/2018 Measured TD: 5040 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: DSPW EP - 2/4/2018 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/4/2018 | | Proposed Depth/Form: | 5040 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OSND , Formation: O SAND , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 284 ft., Weight: 22.74# , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 284 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5040 ft., Weight: 14# , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 4001 ft., Bottom: 5040 ft. | | Casing: | String Type: 2ND, Hole Size: 5 in., Size: 4.5 in., Top: 0 ft., Depth: 5036 ft., Weight: 9.5 , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 5036 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/14/1962 | | Spud Date: | 2/24/1961 | Spud Date Is: | ACTUAL | | Measured TD: | 5040 ft. | Measured PB depth: | 5004 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | I-E, MICRO-LOG & GAMMA-RAY | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 284 ft., Weight: 22.74 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5040 ft., Weight: 14 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 284 ft. | | | | | NIOBRARA | 3795 ft. | | | | | FORT HAYS | 4090 ft. | | | | | CODELL | 4113 ft. | | | | | CARLILE | 4138 ft. | | | | | GREENHORN | 4362 ft. | | | | | GRANEROS | 4501 ft. | | | | | D SAND | 4600 ft. | | | | | J SAND | 4716 ft. | | | | | SKULL CREEK | 4820 ft. | | | | | M SAND | 4941 ft. | | | | | O SAND | 4992 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 5/21/1994 Interval Top: 4997 ft. Interval Bottom: 4998 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/3/1961 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | PUMPING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 4984 ft. | | Tubing Packer Depth: | 4954 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/18/1961 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 81 | | BBLS_OIL | 42 | | GRAVITY_OIL | 16 |
| | Perforation Data: | | Interval Top: | 4997 ft. | # Of Holes: | 8 | | Interval Bottom: | 4998 ft. | Hole Size: | 0.8 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|