Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06464
Well Classification: OW Status: PA - 6/6/2019
Well Name/No:Mahalo #7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WIEPKING-FULLERTON ENERGY LLC - 96340
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/6/2019
FacilityID:427907LocationID:427915
County:LINCOLN #073Location:SENW 29 10S55W 6
Field:GREAT PLAINS - #32756Elevation:5199 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FNL  1980 FWLLat/Long: 39.151460 / -103.577730Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.151460 / -103.577730Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/6/2019             Measured TD: 7890 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/6/2019
Wellbore Permit
Permit #: Expiration Date:5/7/2020
Proposed Depth/Form:7890 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: CRTC , Formation: CRETACEOUS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: KEYES , Formation: KEYES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: PAWNA , Formation: PAWNEE A , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: PAWNB , Formation: PAWNEE B , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: PRMN , Formation: PERMIAN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: TORCH , Formation: TORCH , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 298 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 155, Top: 0 ft., Bottom: 298 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7884 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 265, Top: 5900 ft., Bottom: 7884 ft.
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4060 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 3580 ft., Bottom: 4080 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4663 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4400 ft., Bottom: 4663 ft.

Wellbore Completed
Completion Date:6/30/2012
Spud Date:6/18/2012Spud Date Is:ACTUAL
Measured TD:7890 ft.Measured PB depth:7844 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Compensated Denisty Compensated Neutron Gamma Ray High Resolution Induction Radial Cement Bond Log
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 298 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 155, Top: 0 ft., Bottom: 298 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7884 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 5900 ft., Bottom: 7884 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4060 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 3580 ft., Bottom: 4080 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4663 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4400 ft., Bottom: 4680 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 4400 ft., Depth: 4663 ft., Bottom: 4663 ft., Sacks: 250, Method: STAGE TOOL
Additional Cement:String Type: 1ST , Top: 3950 ft., Depth: 4060 ft., Bottom: 4060 ft., Sacks: 200, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NIOBRARA3154 ft.
CODELL3635 ft.
SHAWNEE6350 ft.
LANSING6602 ft.
TORCH6952 ft.
PAWNEE A6996 ft.
PAWNEE B7021 ft.
CHEROKEE7090 ft.
MORROW7612 ft.
KEYES7806 ft.

Formation MRV11                   Formation Classification:  OW                   Status:  AB - 7/11/2012                 Interval Top: 7784 ft.    Interval Bottom: 7796 ft.

 Completed Information for Formation MORROW V-11
1st Production Date:N/AChoke Size: 
Formation Name:MORROW V-11Commingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/10/2012Treatment End Date:7/11/2012
Treatment Summary:Acid Job 30 bbl 12.5% HCL, 44 bbl 4% HCL
Total fluid used in treatment (bbls):74Max pressure during treatment (psi):2900
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):30Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):70
Fresh water used in treatment (bbls):44Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:7556 ft.
Tubing Packer Depth:7556 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MRV11.
Perforation Data:
Interval Top:7784 ft.# Of Holes:48
Interval Bottom:7796 ft.Hole Size:0.25 in.

Formation CHRK                     Formation Classification:  OW                     Status:  AB - 2/22/2013                 Interval Top: 7094 ft.    Interval Bottom: 7138 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:8/1/2012Choke Size: 
Formation Name:CHEROKEECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/29/2014Treatment End Date:N/A
Treatment Summary:No Treatment, minimum oil production from Cherokee A formation. 5-29-2014 set CIBP @7060' Cherokee A formation plugged and abandoned
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/16/2012Treatment End Date:7/18/2012
Treatment Summary:Acid Job 24 bbl 15% HCL, 41 bbl 2% HCL
Total fluid used in treatment (bbls):65Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):54
Fresh water used in treatment (bbls):41Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 14
CALC_BBLS_H2O 12
CALC_BBLS_OIL 42
GRAVITY_OIL 35
Perforation Data:
Interval Top:7094 ft.# Of Holes:64
Interval Bottom:7138 ft.Hole Size:0.25 in.

Formation PAWNB                   Formation Classification:  OW                   Status:  AB - 6/2/2014                  Interval Top: 7021 ft.    Interval Bottom: 7035 ft.

 Completed Information for Formation PAWNEE B
1st Production Date:N/AChoke Size: 
Formation Name:PAWNEE BCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:6/2/2014Treatment End Date:N/A
Treatment Summary:No Treatment 5-29-2014 perf Pawnee B formaton 7021' - 7035' SWAB all water. 6-2-2014 set CIBP @ 7011' with 2 sks cement, Pawnee B formation plugged and abandoned
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:6973 ft.
Tubing Packer Depth:6973 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/2/2014Test Method:SWAB
Hours Tested:8Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
CALC_BBLS_H2O 120
Perforation Data:
Interval Top:7021 ft.# Of Holes:53
Interval Bottom:7035 ft.Hole Size:0.25 in.

Formation PAWNA                   Formation Classification:  OW                   Status:  AB - 6/12/2014                 Interval Top: 6970 ft.    Interval Bottom: 6996 ft.

 Completed Information for Formation PAWNEE A
1st Production Date:N/AChoke Size: 
Formation Name:PAWNEE ACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/2/2014Treatment End Date:6/3/2014
Treatment Summary:Acid Job 10 bbls 15% HCL, 42 bbls 2% KCL, SWAB recover 45 bbls all water. 6-12-2014 set CIBP @ 6990 with 2 sks cement, Pawnee A formation plugged and abandoned
Total fluid used in treatment (bbls):52Max pressure during treatment (psi):660
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):10Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):45
Fresh water used in treatment (bbls):42Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:6949 ft.
Tubing Packer Depth:6949 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/2/2014Test Method:SWAB
Hours Tested:8Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 15
CALC_BBLS_H2O 45
Perforation Data:
Interval Top:6970 ft.# Of Holes:16
Interval Bottom:6996 ft.Hole Size:0.25 in.

Formation TORCH                   Formation Classification:  OW                   Status:  AB - 10/8/2018                 Interval Top: 6952 ft.    Interval Bottom: 6966 ft.

 Completed Information for Formation TORCH
1st Production Date:6/18/2014Choke Size: 
Formation Name:TORCHCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/12/2014Treatment End Date:6/16/2014
Treatment Summary:6-12-2014 acid job 33 bbls 15% HCL, 42 bbls 2% KCL SWAB recover 85 bbls of fluid 6-16-2014 acid job 48 bbls 15% HCL, 72 bbls 2% KCL SWAB recover 148 bbls of fluid
Total fluid used in treatment (bbls):195Max pressure during treatment (psi):600
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):81Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):233
Fresh water used in treatment (bbls):114Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 40
BTU_GAS 1400
CALC_BBLS_H2O 15
CALC_BBLS_OIL 120
CALC_MCF_GAS 21
GRAVITY_OIL 38
MCF_GAS 7
Perforation Data:
Interval Top:6952 ft.# Of Holes:56
Interval Bottom:6966 ft.Hole Size:0.25 in.

Formation LNSNG                   Formation Classification:  OW                   Status:  AB - 6/6/2019                  Interval Top: 6904 ft.    Interval Bottom: 6944 ft.

 Completed Information for Formation LANSING
1st Production Date:N/AChoke Size: 
Formation Name:LANSINGCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/24/2018Treatment End Date:8/13/2018
Treatment Summary:7/23/2018 Set CIBP @6948', Perforate 6928'-6944' 7/24/2018 Pump 38 bbls acid and 40 bbls 2% KCL, recovered 57 bbls, 10% oil 7/25/2018 Swab recovered 21.5 bbls with a show of oil, run in rods and shut in. 8/7/2018 Pump 100 sks cement, squeeze 8/9/2018 Re-perforate 6928'-6944', pump 38 bbls acid and 50 bbls KCL, swab recovered 34 bbls, no oil 8/10/2018 Recovered 2 bbls, no oil 8/13/2018 Set CIBP @ 6922' with 1 sk cement. Perforate 6904'-6910'. Pump 15 bbls acid and 43 bbls KCL. Recovered 59 bbls water.
Total fluid used in treatment (bbls):224Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):91Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):173
Fresh water used in treatment (bbls):133Disposition method For flowback:DISPOSAL
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation LNSNG.
Perforation Data:
Interval Top:6904 ft.# Of Holes:88
Interval Bottom:6944 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/06/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No