|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 7/1/2020 Measured TD: 7870 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 7/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/3/2016 | | Proposed Depth/Form: | 7870 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: KEYES , Formation: KEYES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: TORCH , Formation: TORCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 307 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 307 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7856 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 5820 ft., Bottom: 7856 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/24/2011 | | Spud Date: | 11/9/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7870 ft. | Measured PB depth: | 7764 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Compensated Density Compensated Neutron Gamma Ray
High Resolution Induction
Radial Spaced Cement Bond Log
Dual Spaced Cement Bond Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 307 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 307 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7856 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4650 ft., Bottom: 7856 ft., Determination Method: CBL | | Additional Cement: | String Type: S.C. 1.1 , Top: 3100 ft., Depth: 4560 ft., Bottom: 4560 ft., Sacks: 250, Method: STAGE TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3013 ft. | | | | | CODELL | 3636 ft. | | | | | DAKOTA | 4065 ft. | | | | | SHAWNEE | 6381 ft. | | | | | LANSING | 6602 ft. | | | | | MARMATON | 6960 ft. | | | | | CHEROKEE | 7070 ft. | | | | | MORROW V-11 | 7722 ft. | | | | | KEYES | 7783 ft. | | | |
Formation MRRW Formation Classification: OW Status: AB - 5/1/2013 Interval Top: 7768 ft. Interval Bottom: 7782 ft.| Completed Information for Formation MORROW | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MORROW | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/7/2011 | | Treatment Summary: | Acid Job 33 bbl 12.5% HCL, 44.5 bbl 2.5% KCL |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7697 ft. | | Tubing Packer Depth: | 7697 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 72 | | CALC_BBLS_H2O | 216 |
| | Perforation Data: | | Interval Top: | 7768 ft. | # Of Holes: | 52 | | Interval Bottom: | 7782 ft. | Hole Size: | 0.25 in. |
|
Formation MRV11 Formation Classification: OW Status: CM - 12/11/2013 Interval Top: 7722 ft. Interval Bottom: 7730 ft.| Completed Information for Formation MORROW V-11 | | 1st Production Date: | 1/1/2012 | Choke Size: | | | Formation Name: | MORROW V-11 | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/29/2013 | Treatment End Date: | N/A | | Treatment Summary: | 1-29-13 Set CIBP at 7670' plug and abandoned Morrow V-11 formation | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 12/8/2011 | | Treatment Summary: | No Treatment SWAB only |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7742 ft. | | Tubing Packer Depth: | 7742 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/27/2013 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 35 | | CALC_BBLS_H2O | 90 | | CALC_BBLS_OIL | 105 | | GRAVITY_OIL | 35 |
| | Perforation Data: | | Interval Top: | 7722 ft. | # Of Holes: | 32 | | Interval Bottom: | 7730 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OW Status: AB - 5/6/2014 Interval Top: 7079 ft. Interval Bottom: 7094 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 3/21/2014 | Treatment End Date: | 3/28/2014 | | Treatment Summary: | 3-21-2014 Drill out CIBP @ 7060' set CIBP @ 7104' with 2 sks cement perf 7079' - 7094' SWAB recover 48 bbls water
3-34-2014 acid job 36 bbls 15% HCL, 42 bbls KCL SWAB recover 65 bbls water
3-27-2014 acid job 36 bbls 15% HCL, 42 bbls 2% KCL SWAB recover 75 bbls water
3-28-2014 set CIBP @ 7060' with 2 sks cement plug and abandon Cherokee formation | | Total fluid used in treatment (bbls): | 156 | Max pressure during treatment (psi): | 500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 72 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 190 | | Fresh water used in treatment (bbls): | 84 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 2/5/2013 | Treatment End Date: | 2/6/2013 | | Treatment Summary: | Acid Job 28 bbls 15% HCL, 45 bbls 4% KCL | | Total fluid used in treatment (bbls): | 73 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 28 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 75 | | Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 1/30/2013 | Treatment End Date: | 1/31/2013 | | Treatment Summary: | Acid Job 14 bbls 15% HCL, 45 bbls 4% KCL | | Total fluid used in treatment (bbls): | 59 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 14 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 60 | | Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7009 ft. | | Tubing Packer Depth: | 7009 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/27/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | CALC_BBLS_H2O | 75 |
| | Perforation Data: | | Interval Top: | 7079 ft. | # Of Holes: | 56 | | Interval Bottom: | 7094 ft. | Hole Size: | 0.25 in. |
|
Formation MRTN Formation Classification: OW Status: AB - 4/2/2014 Interval Top: 6960 ft. Interval Bottom: 6976 ft.| Completed Information for Formation MARMATON | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MARMATON | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 3/31/2014 | Treatment End Date: | 4/2/2014 | | Treatment Summary: | 3-31-2014 acid job 38 bbls 15% HCL, 41 bbls 2% KCL SWAB recover 79 bbls water
4-1-2014 acid job 59 bbls 15% HCL, 56 bbls 2% KCL SWAB recover 72 bbls water
4-2-2014 set CIBP @ 6948' with 2 sks cement plub and abandon Torch formation(top of the Marmaton) | | Total fluid used in treatment (bbls): | 194 | Max pressure during treatment (psi): | 1100 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 97 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 149 | | Fresh water used in treatment (bbls): | 97 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6923 ft. | | Tubing Packer Depth: | 6923 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/1/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | CALC_BBLS_H2O | 72 |
| | Perforation Data: | | Interval Top: | 6960 ft. | # Of Holes: | 46 | | Interval Bottom: | 6976 ft. | Hole Size: | 0.25 in. |
|
Formation LNSNG Formation Classification: OW Status: PR - 7/1/2020 Interval Top: 6920 ft. Interval Bottom: 6932 ft.| Completed Information for Formation LANSING | | 1st Production Date: | 4/10/2014 | Choke Size: | | | Formation Name: | LANSING | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 4/2/2014 | Treatment End Date: | 4/3/2014 | | Treatment Summary: | 4-2-2014, acid job 29 bbls 15% HCL, 41 bbls 2% KCL | | Total fluid used in treatment (bbls): | 70 | Max pressure during treatment (psi): | 800 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 29 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 54 | | Fresh water used in treatment (bbls): | 41 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6885 ft. | | Tubing Packer Depth: | 6885 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/2/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 8 | | BTU_GAS | 1400 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 24 | | CALC_MCF_GAS | 15 | | GRAVITY_OIL | 36 | | MCF_GAS | 5 |
| | Perforation Data: | | Interval Top: | 6920 ft. | # Of Holes: | 48 | | Interval Bottom: | 6932 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1358 |
| Total Gas Produced (MCF) | 1105 |
| GOR | 813 |
| GOR Determination | BOE |
| Average BOE per Day | 4.238 |
| Average MCFE per Day | 24.617 |
| Federal Financial Assurance | i | |
|
|