Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-057-06508
Well Classification: OW Status: TA - 2/4/2026
Well Name/No:Coalmont #3-13H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FULCRUM ENERGY OPERATING LLC - 10805
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date2/4/2026
FacilityID:421255LocationID:421227
County:JACKSON #057Location:SWSW 13 7N81W 6
Field:NORTH PARK HORIZONTAL NIOBRARA - #60120Elevation:8275 ft.
Basin:NORTH PARK BASIN  
Planned Location:329FSL  620 FWLLat/Long: 40.571353 / -106.441983Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.571358 / -106.441981Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/26/2013
End Date: 7/29/2013
Reported: 9/3/2013
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 2/4/2026             Measured TD: 10838 ft.    Vertical TD: 6492 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 2/4/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:2/5/2015
Proposed Top PZ Location:Sec:13 Twp: 7N 81W Footage: 976 FSL  619 FWL
Bottom Hole Location:Sec:13 Twp: 7N 81W Footage: 614 FNL  2134 FWL
Proposed Depth/Form:10596 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 531-2 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 170, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6530 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 600, Top: 0 ft., Bottom: 6530 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5780 ft., Depth: 10596 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 5780 ft., Bottom: 10596 ft.

Wellbore Completed
Completion Date:7/10/2013
Spud Date:6/27/2013Spud Date Is:ACTUAL
Measured TD:10838 ft.Measured PB depth:10751 ft.
True Vertical TD:6492 ft.True Vertical PB depth:6492 ft.
Top PZ Location:Sec:13 Twp: 7N 81WFootage: 976 FSL  619 FWL
Bottom Hole Location:Sec:13 Twp: 7N 81WFootage: 614 FNL  2134 FWL
Log Types:Gamma Ray
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1011 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 440, Top: 0 ft., Bottom: 1011 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 10751 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 955, Top: 5715 ft., Bottom: 10751 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE A2887 ft.NN
SUSSEX4710 ft.NN
PIERRE4771 ft.NN
NIOBRARA6104 ft.10838 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  TA - 2/4/2026                  Interval Top: 6775 ft.    Interval Bottom: 10751 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/1/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/26/2013Treatment End Date:7/29/2013
Treatment Summary:18 stage horizontal stimulation using 4,297,500 lbs of sand and 66,885 barrels of fresh water.
Total fluid used in treatment (bbls):66885Max pressure during treatment (psi):8678
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:18
Total acid used in treatment (bbls):4254Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):22608
Fresh water used in treatment (bbls):62631Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4297500Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:6324 ft.
Tubing Packer Depth:6307 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 754
BBLS_OIL 251
BTU_GAS 1081
CALC_BBLS_H2O 754
CALC_BBLS_OIL 251
CALC_GOR 1171
CALC_MCF_GAS 294
CASING_PRESS 73
GRAVITY_OIL 36
MCF_GAS 294
Perforation Data:
Interval Top:6775 ft.# Of Holes:817
Interval Bottom:10751 ft.Hole Size:0.375 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY03/19/2026
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/10/2024
Defined Inactive (TA)YLast Production
07/16/2025
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No