|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/8/2019 Measured TD: 11486 ft. Vertical TD: 11400 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/8/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/23/2020 | | Proposed Top PZ Location: | Sec:3 Twp: 5S 96W | Footage: 315 FNL 862 FEL | | Bottom Hole Location: | Sec:3 Twp: 5S 96W | Footage: 344 FNL 945 FEL | | Proposed Depth/Form: | 11486 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 995, Top: 0 ft., Bottom: 3000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11486 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 966, Top: 5982 ft., Bottom: 11486 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/19/2018 | | Spud Date: | 12/10/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 11486 ft. | Measured PB depth: | 11418 ft. | | True Vertical TD: | 11400 ft. | True Vertical PB depth: | 11332 ft. | | Top PZ Location: | Sec:3 Twp: 5S 96W | Footage: 361 FNL 834 FEL | | Bottom Hole Location: | Sec:3 Twp: 5S 96W | Footage: 379 FNL 964 FEL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-13024). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2957 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 880, Top: 167 ft., Bottom: 2957 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11464 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 987, Top: 11270 ft., Bottom: 11486 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 7614 ft., Depth: 7878 ft., Bottom: 8604 ft., Sacks: 131, Method: SQUEEZE | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 167 ft., Bottom: 167 ft., Sacks: 140, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 3134 ft. | | N | N | | WASATCH G | 5454 ft. | | N | N | | FORT UNION | 5966 ft. | | N | N | | OHIO CREEK | 7968 ft. | | N | N | | WILLIAMS FORK | 8203 ft. | | N | N | | CAMEO | 10655 ft. | | N | N | | ROLLINS | 11429 ft. | | | |
Formation WFOCCM Formation Classification: GW Status: PR - 7/8/2019 Interval Top: 8055 ft. Interval Bottom: 11311 ft.| Completed Information for Formation WILLIAMS FORK-OHIO CREEK-CAMEO | | 1st Production Date: | 7/8/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK-OHIO CREEK-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/22/2019 | Treatment End Date: | 7/3/2019 | | Treatment Summary: | 14-stage plug-and-perf completion;
269990 total bbls fluid pumped: 153995 bbls recycled water (slickwater), 115828 bbls fresh water (slickwater), and 167 bbls 7.5% HCl acid;
no proppant used. | | Total fluid used in treatment (bbls): | 269990 | Max pressure during treatment (psi): | 8000 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.44 | | Type Of gas: | | Number Of staged intervals: | 14 | | Total acid used in treatment (bbls): | 167 | Min frac gradient (psi/ft): | 0.57 | | Recycled water used in treatment (bbls): | 153995 | Total flowback volume recovered (bbls): | 62868 | | Fresh water used in treatment (bbls): | 115828 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/8/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 663 | | BTU_GAS | 1020 | | CALC_BBLS_H2O | 663 | | CALC_MCF_GAS | 108 | | CASING_PRESS | 1653 | | MCF_GAS | 108 |
| | Perforation Data: | | Interval Top: | 8055 ft. | # Of Holes: | 378 | | Interval Bottom: | 11311 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 598 |
| Total Gas Produced (MCF) | 105285 |
| GOR | 176061 |
| GOR Determination | MCFE |
| Average BOE per Day | 51.395 |
| Average MCFE per Day | 298.100 |
| Federal Financial Assurance | i | |
|
|