Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22404
Well Classification: GW Status: PR - 5/1/2025
Well Name/No:ISLAND RANCH #24C-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:437049LocationID:436810
County:GARFIELD #045Location:Lot 11 13 7S96W 6
Field:PARACHUTE - #67350Elevation:5056 ft.
Basin:PICEANCE BASIN  
Planned Location:1326FSL  1056 FWLLat/Long: 39.433844 / -108.064253Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.433844 / -108.064253Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2025             Measured TD: 6073 ft.    Vertical TD: 5846 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/2/2016
Proposed Top PZ Location:Sec:13 Twp: 7S 96W Footage: 535 FSL  1980 FWL
Bottom Hole Location:Sec:13 Twp: 7S 96W Footage: 535 FSL  1980 FWL
Proposed Depth/Form:5972 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 479-21 , Unit Acreage: 160, Drill Unit: SW/4
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 75 ft., Weight: 84# , Citings Type: PLANNED
Cement:Sacks: 115, Top: 0 ft., Bottom: 75 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 5972 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 950, Top: , Bottom: 5972 ft.

Wellbore Completed
Completion Date:6/13/2014
Spud Date:6/9/2014Spud Date Is:ACTUAL
Measured TD:6073 ft.Measured PB depth:5998 ft.
True Vertical TD:5846 ft.True Vertical PB depth:5771 ft.
Top PZ Location:Sec:13 Twp: 7S 96WFootage: 550 FSL  1990 FWL
Bottom Hole Location:Sec:13 Twp: 7S 96WFootage: 522 FSL  1977 FWL
Log Types:Mud, Triple Combo, and CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 94 ft., Weight: 106.5 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 94 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1023 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 1023 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6043 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 1300 ft., Bottom: 6043 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3116 ft.
CAMEO5402 ft.
ROLLINS5822 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/1/2025                  Interval Top: 4184 ft.    Interval Bottom: 5787 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/30/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/24/2014Treatment End Date:9/27/2014
Treatment Summary:WFCM - Frac'd with 55,796 bbls slickwater and 1,008 bbls 7.5% HCL Acid.
Total fluid used in treatment (bbls):56804Max pressure during treatment (psi):6027
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.44
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):1008Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):55796Total flowback volume recovered (bbls):5373
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5954 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1395
BTU_GAS 1080
CALC_BBLS_H2O 1395
CALC_MCF_GAS 1377
CASING_PRESS 1050
MCF_GAS 1377
Perforation Data:
Interval Top:4184 ft.# Of Holes:189
Interval Bottom:5787 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)50
Total Gas Produced (MCF)35228
GOR704560
GOR DeterminationMCFE
Average BOE per Day16.780
Average MCFE per Day97.317

 Federal Financial Assurance  i 

 Tribal Well  i No