Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15165
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:N. PARACHUTE #CP 11B-21 G21 5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:293925LocationID:335929
County:GARFIELD #045Location:SWNE 21 5S96W 6
Field:GRAND VALLEY - #31290Elevation:7972 ft.
Basin:PICEANCE BASIN  
Planned Location:1947FNL  2185 FELLat/Long: 39.602503 / -108.172519Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.602501 / -108.172524Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/22/2012
End Date: 1/22/2012
Reported: 7/27/2012
Prior to rule 205A.b.(2)(A)
Days to report: 187
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 10379 ft.    Vertical TD: 10082 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20075766 Expiration Date:12/12/2008
Proposed Top PZ Location:Sec:21 Twp: 5S 96W Footage: 2421   1703 
Bottom Hole Location:Sec:21 Twp: 5S 96W Footage: 2421   1703 
Proposed Depth/Form:10279 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit:
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 10279 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 350, Top: 6703 ft., Bottom: 10279 ft.

Wellbore Completed
Completion Date:11/9/2009
Spud Date:3/28/2009Spud Date Is:ACTUAL
Measured TD:10379 ft.Measured PB depth:
True Vertical TD:10082 ft.True Vertical PB depth:
Top PZ Location:Sec:21 Twp: 5S 96WFootage: 2421 FSL  1703 FWL
Bottom Hole Location:Sec:21 Twp: 5S 96WFootage: 2421 FSL  1703 FWL
Log Types:GR/CBL/CCL/MUD; DIGITAL LOGS RECEIVED & APPROVED
Log Types:TEMP
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 92 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 92 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.6875 in., Top: 0 ft., Depth: 3035 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1297, Top: 0 ft., Bottom: 3035 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10356 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1062, Top: 4900 ft., Bottom: 10356 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH A2801 ft.NN
OHIO CREEK6277 ft.NN
WILLIAMS FORK6698 ft.NN
CAMEO9551 ft.NN
ROLLINS10123 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 6727 ft.    Interval Bottom: 10059 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:1/24/2012Choke Size:20.000 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/18/2012
Treatment Summary:Stages 01-10 treated with a total of: 104427 bbls of Slickwater.
Tubing Size:2.375 in.Tubing Setting Depth:9692 ft.
Tubing Packer Depth:0 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/24/2012Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 119
BTU_GAS 1170
CALC_BBLS_H2O 119
CALC_MCF_GAS 1393
CASING_PRESS 907
MCF_GAS 1393
TUBING_PRESS 345
Perforation Data:
Interval Top:6727 ft.# Of Holes:300
Interval Bottom:10059 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10
GOR
GOR DeterminationMCFE
Average BOE per Day0.006
Average MCFE per Day0.028

 Federal Financial Assurance  i 

 Tribal Well  i No