Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11013
Well Classification: GW Status: SI - 8/1/2025
Well Name/No:KEINATH #33-15 (OB4)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date8/1/2025
FacilityID:279203LocationID:334152
County:GARFIELD #045Location:NWNE 4 8S96W 6
Field:GRAND VALLEY - #31290Elevation:5101 ft.
Basin:PICEANCE BASIN  
Planned Location:440FNL  1776 FELLat/Long: 39.385010 / -108.111136Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.385000 / -108.111320Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 8/1/2025             Measured TD: 5685 ft.    Vertical TD: 5451 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 8/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20052395 Expiration Date:8/4/2006
Proposed Top PZ Location:Sec:33 Twp: 7S 96W Footage: 660 FSL  1980 FEL
Bottom Hole Location:Sec:33 Twp: 7S 96W Footage: 660 FSL  1980 FEL
Proposed Depth/Form:5726 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/4/2005
Spud Date:9/17/2005Spud Date Is:ACTUAL
Measured TD:5685 ft.Measured PB depth:5637 ft.
True Vertical TD:5451 ft.True Vertical PB depth:
Top PZ Location:Sec:33 Twp: 7S 96WFootage: 660 FSL  1980 FEL
Bottom Hole Location:Sec:33 Twp: 7S 96WFootage: 660 FSL  1980 FEL
Log Types:CBL, PEX
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 30 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 40 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1550 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 970, Top: 0 ft., Bottom: 1550 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5685 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 0 ft., Bottom: 5685 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WASATCH0 ft.2314 ft.NN
WILLIAMS FORK2315 ft.4977 ft.NN
ROLLINS4978 ft.5219 ft.NN
COZZETTE5220 ft.5442 ft.NN
CORCORAN5443 ft.5685 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 8/1/2025                  Interval Top: 5484 ft.    Interval Bottom: 5555 ft.

 Completed Information for Formation CORCORAN
1st Production Date:10/20/2005Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/17/2005
Treatment Summary:STAGE 1 WAS TREATED WITH A TOTAL OF 1699 BBLS YF 120LGD AND 202,000# OF 20-40 SAND. TREATMENT DATE: 10/17/05 FIRST PRODUCTION 10/20/05
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2005Test Method:FLOWING
Hours Tested:Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 37
CALC_MCF_GAS 87
Perforation Data:
Interval Top:5484 ft.# Of Holes:48
Interval Bottom:5555 ft.Hole Size:0.34375 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 8/1/2025                  Interval Top: 5246 ft.    Interval Bottom: 5343 ft.

 Completed Information for Formation COZZETTE
1st Production Date:10/20/2005Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/18/2005
Treatment Summary:STAGE 2 WAS TREATED WITH A TOTAL OF 1692 BBLS YF 120LGD AND 202,000# OF 20-40 SAND. TREATMENT DATE: 10/18/05 FIRST PRODUCTION 10/20/05
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/2005Test Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
MCF_GAS 0
Perforation Data:
Interval Top:5246 ft.# Of Holes:62
Interval Bottom:5343 ft.Hole Size:0.34375 in.

Formation WMFK                     Formation Classification:  GW                     Status:  SI - 8/1/2025                  Interval Top: 3437 ft.    Interval Bottom: 4896 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:10/23/2005Choke Size:24.000 in.
Formation Name:WILLIAMS FORKCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/21/2005
Treatment Summary:STATES 3 THROUGH 8 WERE TREATED WITH A TOTAL OF 26,172 BBLS SLICKWATER AND 585,000# OF 20-40 SAND. TREATMENT DATE: 10/21/05 DATE OF FIRST PRODUCTION 10/23/05 TUBING SETTING DATE 10/31/05
Tubing Size:2.375 in.Tubing Setting Depth:4833 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/1/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 328
BBLS_OIL 0
BTU_GAS 1170
CALC_BBLS_H2O 328
CALC_MCF_GAS 788
CASING_PRESS 1600
MCF_GAS 788
TUBING_PRESS 1000
Perforation Data:
Interval Top:3437 ft.# Of Holes:108
Interval Bottom:4896 ft.Hole Size:0.34375 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)119
GOR
GOR DeterminationMCFE
Average BOE per Day0.056
Average MCFE per Day0.320

 Federal Financial Assurance  i 

 Tribal Well  i No