|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/6/2021 Measured TD: 8730 ft. Vertical TD: 8603 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/6/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | 20075611 | Expiration Date: | 2/5/2009 | Proposed Top PZ Location: | Sec: Twp: | Footage: 2130 FNL 510 FEL | Bottom Hole Location: | Sec:34 Twp: 1N 68W | Footage: 2130 FNL 510 FEL | Proposed Depth/Form: | 8735 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: E2 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5819 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 260, Top: 4751 ft., Bottom: 5819 ft. |
| | |
Wellbore Completed | Completion Date: | 8/4/2008 | Spud Date: | 7/29/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8730 ft. | Measured PB depth: | 8679 ft. | True Vertical TD: | 8603 ft. | True Vertical PB depth: | 8552 ft. | Top PZ Location: | Sec:34 Twp: 1N 68W | Footage: 2133 FNL 498 FEL | Bottom Hole Location: | Sec:34 Twp: 1N 68W | Footage: 2133 N 498 E | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1080 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 480, Top: 0 ft., Bottom: 1080 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8715 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 290, Top: 7100 ft., Bottom: 8715 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5535 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 4250 ft., Bottom: 5535 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5535 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 230, Top: 4250 ft., Bottom: 5535 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 7669 ft. | | N | N | CODELL | 8104 ft. | | N | N | J SAND | 8552 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 8574 ft. Interval Bottom: 8590 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/10/2008 | Treatment Summary: | JSND COMPLETION FRAC'D THE JSND WITH 155,190 GAL 20# TO 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 252,180# SAND. 09-10-08. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8574 ft. | # Of Holes: | 32 | Interval Bottom: | 8590 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/28/2008 Interval Top: 7946 ft. Interval Bottom: 8590 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/28/2008 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP'S TO COMMINGLE THE JSND-NBRR-CDL. 10-22-08. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8561 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/28/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 20 | BBLS_OIL | 20 | BTU_GAS | 1177 | CALC_BBLS_H2O | 20 | CALC_BBLS_OIL | 20 | CALC_GOR | 10000 | CALC_MCF_GAS | 200 | CASING_PRESS | 1088 | GRAVITY_OIL | 48 | MCF_GAS | 200 | TUBING_PRESS | 262 |
| Perforation Data: | Interval Top: | 7946 ft. | # Of Holes: | 152 | Interval Bottom: | 8590 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/6/2021 Interval Top: 7946 ft. Interval Bottom: 8146 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/10/2008 | Treatment Summary: | NBRR-CDL RECOMPLETION SET CFP @ 8250'. 9-10-08. FRAC'D THE CODELL WITH 108,908 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,240# SAND. 9-10-08 SET CFP @ 7950'. 9-10-08.--SEE OPERATORS COMMENTS |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/15/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 113 | BBLS_OIL | 89 | BTU_GAS | 1177 | CALC_BBLS_H2O | 113 | CALC_BBLS_OIL | 89 | CALC_GOR | 2933 | CALC_MCF_GAS | 261 | CASING_PRESS | 700 | GRAVITY_OIL | 48 | MCF_GAS | 261 |
| Perforation Data: | Interval Top: | 7946 ft. | # Of Holes: | 120 | Interval Bottom: | 8146 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 01/06/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|