|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/14/2025 Measured TD: 8430 ft. Vertical TD: 8316 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/14/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20080013 | Expiration Date: | 2/27/2009 | | Proposed Top PZ Location: | Sec:10 Twp: 1N 69W | Footage: 2095 FNL 2020 FEL | | Bottom Hole Location: | Sec:10 Twp: 1N 69W | Footage: 2095 FNL 2020 FEL | | Proposed Depth/Form: | 8401 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 80, Drill Unit: W2NE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE/4 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5358 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4358 ft., Bottom: 5358 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/2/2008 | | Spud Date: | 11/24/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8430 ft. | Measured PB depth: | 8359 ft. | | True Vertical TD: | 8316 ft. | True Vertical PB depth: | 8245 ft. | | Top PZ Location: | Sec:10 Twp: 1N 69W | Footage: 2095 FNL 2020 FEL | | Bottom Hole Location: | Sec:10 Twp: 1N 69W | Footage: 2095 FNL 2020 FEL | | Log Types: | CBL, DUAL IND/COMP.DENSITY/COMP.NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 951 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 951 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8414 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 6980 ft., Bottom: 8430 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4585 ft. | | N | N | | SHANNON | 5060 ft. | | N | N | | NIOBRARA | 7456 ft. | | N | N | | CODELL | 7832 ft. | | N | N | | J SAND | 8249 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 7/14/2025 Interval Top: 8262 ft. Interval Bottom: 8278 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/9/2008 | | Treatment Summary: | JSND COMPLETION. FRAC'D THE JSND W/ 150,276 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,960# SAND. 12/9/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8262 ft. | # Of Holes: | 32 | | Interval Bottom: | 8278 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 12/23/2024 Interval Top: 7832 ft. Interval Bottom: 7852 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7832 ft. | # Of Holes: | 10 | | Interval Bottom: | 7852 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 1/28/2008 Interval Top: 7456 ft. Interval Bottom: 8278 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/2/2008 | | Treatment Summary: | JSND-NBRR-CODL COMMINGLE. DRILED OUT CFP @ 7740'. 12/21/08. DRILLED OUT CFP @ 7960' TO COMMINGLE JSND-NBRR-CODL. 12/22/08 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8238 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/28/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 246 | | BBLS_OIL | 56 | | BTU_GAS | 45 | | CALC_BBLS_H2O | 246 | | CALC_BBLS_OIL | 56 | | CALC_GOR | 5357 | | CALC_MCF_GAS | 300 | | CASING_PRESS | 1390 | | GRAVITY_OIL | 1163 | | MCF_GAS | 300 | | TUBING_PRESS | 484 |
| | Perforation Data: | | Interval Top: | 7456 ft. | # Of Holes: | 120 | | Interval Bottom: | 8278 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/14/2025 Interval Top: 7456 ft. Interval Bottom: 7852 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/9/2008 | | Treatment Summary: | NB-CD RECOMPLETION. SET CFP @7960'. FRAC'D CODL W/109,284 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAIING 250,440# SAND. SET CFP @7740'. FRAC'D NBRR W/118,944 GAL 18# VISTAR HYBRID CROSS LINKED GEL W/250,260# SAND. 12/9/08. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7456 ft. | # Of Holes: | 88 | | Interval Bottom: | 7852 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/23/2024 Interval Top: 7456 ft. Interval Bottom: 7608 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7456 ft. | # Of Holes: | 78 | | Interval Bottom: | 7608 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/14/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2028 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|