Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06560
Well Classification: OW Status: PA - 6/30/2021
Well Name/No:YOUNG MC #23-11D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/30/2021
FacilityID:291849LocationID:335890
Municipality/County:ERIE / BOULDER #013Location:NWSW 23 1N69W 6
Field:WATTENBERG - #90750Elevation:5104 ft.
Planned Location:2113FSL  284 FWLLat/Long: 40.035000 / -105.092240Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.034999 / -105.092246Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/30/2021             Measured TD: 8760 ft.    Vertical TD: 8473 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/30/2021
Wellbore PermitDIRECTIONAL
Permit #:20091698 Expiration Date:5/27/2010
Proposed Top PZ Location:Sec:23 Twp: 1N 69W Footage: 2045 FSL  1900 FWL
Bottom Hole Location:Sec:23 Twp: 1N 69W Footage: 2050 FSL  1916 FWL
Proposed Depth/Form:8460 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SW4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2SW4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 680 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 680 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8650 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: , Bottom: 8650 ft.

Wellbore Completed
Completion Date:9/29/2009
Spud Date:9/21/2009Spud Date Is:ACTUAL
Measured TD:8760 ft.Measured PB depth:8709 ft.
True Vertical TD:8473 ft.True Vertical PB depth:8422 ft.
Top PZ Location:Sec:23 Twp: 1N 69WFootage: 2045 FSL  1900 FWL
Bottom Hole Location:Sec:23 Twp: 1N 69WFootage: 2050 FSL  1916 FWL
Log Types:CBL/GRL/CCL, SDL/DSNL/ACL/TRL, CSL/NGRL.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 13 ft., Depth: 1017 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 374, Top: 0 ft., Bottom: 1017 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 13 ft., Depth: 8749 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 7110 ft., Bottom: 8749 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 6700 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 1300 ft., Bottom: 6700 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7751 ft.
FORT HAYS8140 ft.
CODELL8159 ft.
GREENHORN8274 ft.
D SAND8526 ft.
MOWRY8573 ft.
J SAND8587 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 6/30/2021                 Interval Top: 8601 ft.    Interval Bottom: 8610 ft.

 Completed Information for Formation J SAND
1st Production Date:1/12/2010Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/10/2009
Treatment Summary:Frac'd the J-Sand w/ 178458 gals of Silverstim and Slick Water with 334,000#'s of Ottawa sand. The J-Sand is producing through a Composite Flow Through Plug.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8601 ft.# Of Holes:36
Interval Bottom:8610 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 1/12/2010                 Interval Top: 7936 ft.    Interval Bottom: 8610 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/12/2010Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/10/2009
Treatment Summary:Frac'd the J-Sand w/ 178458 gals of Silverstim and Slick Water with 334,000#'s of Ottawa sand. The J-Sand is producing through a Composite Flow Through Plug. Frac'd the Niobrara-Codell w/ 307692 gals of Silverstim and Slick Water with 521,000#'s of Ottawa sand. The Codell is producing through a Composite Flow Through Plug.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/12/2010Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 114
BBLS_OIL 128
BTU_GAS 1185
CALC_BBLS_H2O 114
CALC_BBLS_OIL 128
CALC_GOR 4281
CALC_MCF_GAS 548
CASING_PRESS 1050
GRAVITY_OIL 51
MCF_GAS 548
Perforation Data:
Interval Top:7936 ft.# Of Holes:120
Interval Bottom:8610 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/30/2021                 Interval Top: 7936 ft.    Interval Bottom: 8176 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/12/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/10/2009
Treatment Summary:Frac'd the Niobrara-Codell w/ 307692 gals of Silverstim and Slick Water with 521,000#'s of Ottawa sand. The Codell is producing through a Composite Flow Through Plug. Commingle the Niobrara and Codell.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7936 ft.# Of Holes:84
Interval Bottom:8176 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/30/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No