|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2021 Measured TD: 8620 ft. Vertical TD: 8336 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20072688 | Expiration Date: | 7/10/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2008 FSL 1999 FEL | | Bottom Hole Location: | Sec:12 Twp: 1N 69W | Footage: 2008 FSL 1999 FEL | | Proposed Depth/Form: | 8578 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5442 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4410 ft., Bottom: 5442 ft. |
| | |
| Wellbore Completed | | Completion Date: | 4/24/2008 | | Spud Date: | 4/15/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8620 ft. | Measured PB depth: | 8512 ft. | | True Vertical TD: | 8336 ft. | True Vertical PB depth: | 8228 ft. | | Top PZ Location: | Sec:12 Twp: 1N 69W | Footage: 1983 FSL 2019 FEL | | Bottom Hole Location: | Sec:12 Twp: 1N 69W | Footage: 1983 FSL 2019 FEL | | Log Types: | CBL, | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 0 ft., Bottom: 906 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8605 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 5624 ft., Bottom: 8605 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5624 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 3680 ft., Bottom: 5624 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4572 ft. | | N | N | | SHANNON | 5278 ft. | | N | N | | NIOBRARA | 7660 ft. | | N | N | | CODELL | 8040 ft. | | N | N | | J SAND | 8466 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2021 Interval Top: 8478 ft. Interval Bottom: 8498 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/15/2008 | | Treatment Summary: | 167,874 GAL FRAC FLUID; 242,060# SAND; 12,080 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8478 ft. | # Of Holes: | 80 | | Interval Bottom: | 8498 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/2/2008 Interval Top: 7808 ft. Interval Bottom: 8498 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/15/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8460 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/2/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 93 | | BBLS_OIL | 161 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 93 | | CALC_BBLS_OIL | 161 | | CALC_GOR | 2994 | | CALC_MCF_GAS | 482 | | CASING_PRESS | 1439 | | GRAVITY_OIL | 50 | | MCF_GAS | 482 | | TUBING_PRESS | 773 |
| | Perforation Data: | | Interval Top: | 7808 ft. | # Of Holes: | 152 | | Interval Bottom: | 8498 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 5/1/2021 Interval Top: 7808 ft. Interval Bottom: 8058 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2008 | | Treatment Summary: | FRAC'D CODELL W/113,736 GAL FRAC GEL FLUID; 253,720# SAND; FRAC'D NIOBRARA W/ 168,840 GAL FRAC FLUID; 253,140# SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7808 ft. | # Of Holes: | 112 | | Interval Bottom: | 8058 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 293 |
| Total Gas Produced (MCF) | 3430 |
| GOR | 11706 |
| GOR Determination | BOE |
| Average BOE per Day | 2.420 |
| Average MCFE per Day | 14.023 |
| Federal Financial Assurance | i | |
|
|