|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2020 Measured TD: 8320 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2020 | | Wellbore Permit | | | Permit #: | 20081580 | Expiration Date: | 6/10/2009 | | Proposed Depth/Form: | 8325 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5300 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 4100 ft., Bottom: 5300 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/28/2009 | | Spud Date: | 3/23/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 8320 ft. | Measured PB depth: | 8250 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 866 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 866 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8306 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 710, Top: 3130 ft., Bottom: 8306 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7364 ft. | | N | N | | CODELL | 7728 ft. | | N | N | | J SAND | 8155 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2020 Interval Top: 8155 ft. Interval Bottom: 8182 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/12/2009 | | Treatment Summary: | JSND COMPLETION. FRAC;D THE JSND WITH 151,998 GAL 20# VISTAR HYBRID CROSS LINKED GELCONTAINING 252,920# SAND. 04/12/09. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8155 ft. | # Of Holes: | 40 | | Interval Bottom: | 8182 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/20/2009 Interval Top: 7478 ft. Interval Bottom: 8182 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/28/2009 | | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP'S ON 05/04/2009 TO COMMINGLE THE JSND-NBRR-CDL. 05/04/2009 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8132 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/20/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 100 | | BBLS_OIL | 106 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 100 | | CALC_BBLS_OIL | 106 | | CALC_GOR | 3811 | | CALC_MCF_GAS | 404 | | CASING_PRESS | 807 | | GRAVITY_OIL | 51 | | MCF_GAS | 404 |
| | Perforation Data: | | Interval Top: | 7478 ft. | # Of Holes: | 160 | | Interval Bottom: | 8182 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 7/1/2019 Interval Top: 7478 ft. Interval Bottom: 7748 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 4/12/2009 | | Treatment Summary: | NBRR-CDL RECOMPLETION. SET CFP@7840'. 04/12/09. FRAC'D THE CODELL WITH 113,652 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,720# 20/40 SAND. 04/12/09. SET CFP@7610'. 04/12/09 FRAC'D THE NBRR W/140,910 GAL 18# VISTAR CROSS LINKED GEL CONT NEXT PG |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7478 ft. | # Of Holes: | 120 | | Interval Bottom: | 7748 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 895 |
| Total Gas Produced (MCF) | 10010 |
| GOR | 11184 |
| GOR Determination | BOE |
| Average BOE per Day | 7.177 |
| Average MCFE per Day | 41.636 |
| Federal Financial Assurance | i | |
|
|