Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07383
Well Classification: OW Status: PR - 2/1/2025
Well Name/No:Prosper Farms 4-65 11-12 #3AH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2025
FacilityID:456548LocationID:456540
County:ARAPAHOE #005Location:NWSW 11 4S65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5664 ft.
Planned Location:2356FSL  490 FWLLat/Long: 39.717606 / -104.639089Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.717606 / -104.639089Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/25/2019
End Date: 8/3/2019
Reported: 1/26/2020
Originally Reported: 8/22/2019
Days to report: 176
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2025             Measured TD: 17827 ft.    Vertical TD: 7710 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:8/12/2020
Proposed Top PZ Location:Sec:11 Twp: 4S 65W Footage: 2464 FSL  772 FWL
Bottom Hole Location:Sec:11 Twp: 4S 65W Footage: 2488 FSL  351 FEL
Proposed Depth/Form:17841 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-905 , Unit Acreage: 1280, Drill Unit: SEC 11 and 12 All
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2153 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 2153 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17841 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 2200, Top: 2153 ft., Bottom: 17841 ft.

Wellbore Completed
Completion Date:2/28/2019
Spud Date:2/21/2019Spud Date Is:ACTUAL
Measured TD:17827 ft.Measured PB depth:17729 ft.
True Vertical TD:7710 ft.True Vertical PB depth:7711 ft.
Top PZ Location:Sec:11 Twp: 4S 65WFootage: 2464 FSL  772 FWL
Bottom Hole Location:Sec:11 Twp: 4S 65WFootage: 2488 FSL  351 FEL
Log Types:MWD/LWD; Mud Log; CBL; (Resistivity in API 005-07384)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2239 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 745, Top: 0 ft., Bottom: 2250 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17805 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2325, Top: 250 ft., Bottom: 17827 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1747 ft.
PIERRE1953 ft.
SUSSEX7223 ft.
SHANNON7523 ft.
SHARON SPRINGS7747 ft.
NIOBRARA7838 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/1/2025                  Interval Top: 8375 ft.    Interval Bottom: 17676 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/6/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/25/2019Treatment End Date:8/3/2019
Treatment Summary:333 bbls 15% HCI Acid; 687 bbls Fresh Water; 6329 bbls Wireline Pump In; 126991 bbls FR Water; 1571 bbls 7.5% HCI Acid; 29932 bbls HVFR Water; 621196 lbs 100 Mesh; 6029950 lbs 40/70 White
Total fluid used in treatment (bbls):165843Max pressure during treatment (psi):9200
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:27
Total acid used in treatment (bbls):1904Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):6329Total flowback volume recovered (bbls):6635
Fresh water used in treatment (bbls):157610Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6651146Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:7773 ft.
Tubing Packer Depth:7590 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/6/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 124
BBLS_OIL 119
CALC_BBLS_H2O 124
CALC_BBLS_OIL 119
CALC_GOR 1109
CALC_MCF_GAS 132
CASING_PRESS 7
GRAVITY_OIL 39
MCF_GAS 132
TUBING_PRESS 1026
Perforation Data:
Interval Top:8375 ft.# Of Holes:266
Interval Bottom:17676 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)1112
Total Gas Produced (MCF)3673
GOR3303
GOR DeterminationBOE
Average BOE per Day4.779
Average MCFE per Day27.721

 Federal Financial Assurance  i 

 Tribal Well  i No