|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2018 Measured TD: 7915 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2018 | Wellbore Permit | | Permit #: | | Expiration Date: | 6/18/2007 | Proposed Depth/Form: | 7915 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 581 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 405, Top: 0 ft., Bottom: 581 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7907 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 22, Top: 6640 ft., Bottom: 7907 ft. | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1939 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 1300, Top: 0 ft., Bottom: 2010 ft. |
| | |
Wellbore Completed | Completion Date: | 9/14/1995 | Spud Date: | 8/9/1995 | Spud Date Is: | ACTUAL | Measured TD: | 7915 ft. | Measured PB depth: | 7859 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | DIL/SFL/GR; CBL; CDEN/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 581 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 405, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7907 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1520, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4836 ft. | | | | NIOBRARA | 7010 ft. | | | | FORT HAYS | 7336 ft. | | | | D SAND | 7731 ft. | | | | J SAND | 7775 ft. | | | |
Formation JSND Formation Classification: GW Status: SI - 7/1/2018 Interval Top: 7803 ft. Interval Bottom: 7818 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/14/1995 | Choke Size: | 0.000 in. | Formation Name: | J SAND | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/14/1995 | Treatment Summary: | SEE SCANNED DOCUMENT #00420630 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7843 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/23/1995 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 32 | CALC_GOR | 969 | CASING_PRESS | 60 | GRAVITY_OIL | 60 | MCF_GAS | 31 | TUBING_PRESS | 40 |
| Perforation Data: | Interval Top: | 7803 ft. | # Of Holes: | 30 | Interval Bottom: | 7818 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (SI ) | Y | Defined Inactive 06/30/2018 |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|