|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 2/5/2018 Measured TD: 8202 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 2/5/2018 | Wellbore Permit | DRIFTED | Permit #: | 19810935 | Expiration Date: | 11/10/1981 | Proposed Depth/Form: | 8500 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: NE4 |
| | |
Wellbore Completed | Completion Date: | 9/4/1981 | Spud Date: | 6/26/1981 | Spud Date Is: | ACTUAL | Measured TD: | 8202 ft. | Measured PB depth: | 8198 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | IND LOG/CDLC/GR/SPECTRALOG | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 417 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 417 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8202 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 7570 ft., Bottom: 8202 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 1795 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 90, Top: 1350 ft., Bottom: 1800 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 5110 ft. | | | | NIOBRARA | 7350 ft. | | | | J SAND | 8100 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 2/5/2018 Interval Top: 8123 ft. Interval Bottom: 8147 ft. Completed Information for Formation J SAND | 1st Production Date: | 2/22/1983 | Choke Size: | 0.750 in. | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/4/1981 | Treatment Summary: | SEE SCANNED DOCUMENT #00407829 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8050 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/4/1981 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 43 | CALC_BBLS_OIL | 43 | CALC_MCF_GAS | 550 | CASING_PRESS | 1580 | GRAVITY_OIL | 44 | MCF_GAS | 550 | TUBING_PRESS | 110 |
| Perforation Data: | Interval Top: | 8123 ft. | # Of Holes: | 21 | Interval Bottom: | 8147 ft. | Hole Size: | 3.125 in. |
|
|
|
|
|
Reported Plugged | Y | 02/05/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|