Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10254
Well Classification: OW Status: PR - 10/1/2022
Well Name/No:Schaefer LD #13-032HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2022
FacilityID:458704LocationID:440718
County:ADAMS #001Location:SWSE 24 1S67W 6
Field:WATTENBERG - #90750Elevation:5022 ft.
Planned Location:349FSL  1949 FELLat/Long: 39.944279 / -104.834787Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.944279 / -104.834788Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/18/2019
End Date: 4/3/2019
Reported: 4/16/2019
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2022             Measured TD: 18218 ft.    Vertical TD: 7751 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/3/2020
Proposed Top PZ Location:Sec:24 Twp: 1S 67W Footage: 503 FSL  2236 FEL
Bottom Hole Location:Sec:13 Twp: 1S 67W Footage: 237 FNL  2241 FEL
Proposed Depth/Form:18457 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1905 , Unit Acreage: 1280, Drill Unit: Secs. 13 & 24: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18457 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1612, Top: 1612 ft., Bottom: 18457 ft.

Wellbore Completed
Completion Date:2/2/2019
Spud Date:12/9/2018Spud Date Is:ACTUAL
Measured TD:18218 ft.Measured PB depth:18208 ft.
True Vertical TD:7751 ft.True Vertical PB depth:7751 ft.
Top PZ Location:Sec:24 Twp: 1S 67WFootage: 503 FSL  2236 FEL
Bottom Hole Location:Sec:13 Twp: 1S 67WFootage: 237 N  2241 E
Log Types:Mud, MWD/LWD, CBL (Resistivity in 001-09858)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1784 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 0 ft., Bottom: 1784 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18218 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2365, Top: 3988 ft., Bottom: 18218 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4507 ft.4671 ft.NN
SUSSEX4868 ft.5063 ft.NN
SHANNON5571 ft.5761 ft.NN
SHARON SPRINGS7387 ft.NN
NIOBRARA7515 ft.NN
FORT HAYS8066 ft.NN
CODELL8139 ft.NN
CARLILE8226 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/22/2019                Interval Top: 14215 ft.    Interval Bottom: 14486 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/19/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:14215 ft.# Of Holes:1440
Interval Bottom:14486 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/22/2019                Interval Top: 10215 ft.    Interval Bottom: 14616 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/19/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/22/2019Treatment End Date:N/A
Treatment Summary:10215-10216;12728-13295;14087-14175;14526-14616
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10215 ft.# Of Holes:1440
Interval Bottom:14616 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/22/2019                Interval Top: 8495 ft.    Interval Bottom: 15653 ft.

 Completed Information for Formation CODELL
1st Production Date:4/19/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/22/2019Treatment End Date:N/A
Treatment Summary:8495-8730;8888-10179;10252-12692;13326-13853;13890-14055;14652-15653
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8495 ft.# Of Holes:1440
Interval Bottom:15653 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/22/2019                Interval Top: 8378 ft.    Interval Bottom: 17930 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/19/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/22/2019Treatment End Date:N/A
Treatment Summary:8378-8494;8778-8854;15690-17930
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8378 ft.# Of Holes:1440
Interval Bottom:17930 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 10/1/2022                 Interval Top: 8378 ft.    Interval Bottom: 17930 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/19/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2019Treatment End Date:4/3/2019
Treatment Summary:541,913# 100 Mesh Sand; 8,907,448# 20/40 Sand; 165,101 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):165101Max pressure during treatment (psi):4835
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14741
Fresh water used in treatment (bbls):165101Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9449361Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7986 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8806
BBLS_OIL 682
BTU_GAS 1341
CALC_BBLS_H2O 8806
CALC_BBLS_OIL 682
CALC_GOR 981
CALC_MCF_GAS 669
CASING_PRESS 3000
GRAVITY_OIL 42
MCF_GAS 669
TUBING_PRESS 1900
Perforation Data:
Interval Top:8378 ft.# Of Holes:1440
Interval Bottom:17930 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)21007
Total Gas Produced (MCF)104549
GOR4976
GOR DeterminationBOE
Average BOE per Day106.692
Average MCFE per Day618.792

 Federal Financial Assurance  i 

 Tribal Well  i No