Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10254
Well Classification: OW Status: PR - 10/1/2022
Well Name/No:Schaefer LD #13-032HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2022
FacilityID:458704LocationID:440718
County:ADAMS #001Location:SWSE 24 1S67W 6
Field:WATTENBERG - #90750Elevation:5022 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:349FSL  1949 FELLat/Long: 39.944279 / -104.834787Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.944279 / -104.834788Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/18/2019
End Date: 4/3/2019
Reported: 4/16/2019
Days to report: 13
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/1/2022             Measured TD: 18218 ft.    Vertical TD: 7751 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/3/2020
Proposed Top PZ Location:Sec:24 Twp: 1S 67W Footage: 503 FSL  2236 FEL
Bottom Hole Location:Sec:13 Twp: 1S 67W Footage: 237 FNL  2241 FEL
Proposed Depth/Form:18457 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-1905 , Unit Acreage: 1280, Drill Unit: Secs. 13 & 24: All
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18457 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1612, Top: 1612 ft., Bottom: 18457 ft.

Wellbore Completed
Completion Date:2/2/2019
Spud Date:12/9/2018Spud Date Is:ACTUAL
Measured TD:18218 ft.Measured PB depth:18208 ft.
True Vertical TD:7751 ft.True Vertical PB depth:7751 ft.
Top PZ Location:Sec:24 Twp: 1S 67WFootage: 503 FSL  2236 FEL
Bottom Hole Location:Sec:13 Twp: 1S 67WFootage: 237 FNL  2241 FEL
Log Types:Mud, MWD/LWD, CBL (Resistivity in 001-09858)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1784 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 890, Top: 0 ft., Bottom: 1784 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18218 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2365, Top: 3988 ft., Bottom: 18218 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4507 ft.4671 ft.NN
SUSSEX4868 ft.5063 ft.NN
SHANNON5571 ft.5761 ft.NN
SHARON SPRINGS7387 ft.NN
NIOBRARA7515 ft.NN
FORT HAYS8066 ft.NN
CODELL8139 ft.NN
CARLILE8226 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/22/2019                Interval Top: 14215 ft.    Interval Bottom: 14486 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/19/2019Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:14215 ft.# Of Holes:1440
Interval Bottom:14486 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/22/2019                Interval Top: 10215 ft.    Interval Bottom: 14616 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/19/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/22/2019Treatment End Date:N/A
Treatment Summary:10215-10216;12728-13295;14087-14175;14526-14616
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:10215 ft.# Of Holes:1440
Interval Bottom:14616 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/22/2019                Interval Top: 8495 ft.    Interval Bottom: 15653 ft.

 Completed Information for Formation CODELL
1st Production Date:4/19/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/22/2019Treatment End Date:N/A
Treatment Summary:8495-8730;8888-10179;10252-12692;13326-13853;13890-14055;14652-15653
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8495 ft.# Of Holes:1440
Interval Bottom:15653 ft.Hole Size:

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/22/2019                Interval Top: 8378 ft.    Interval Bottom: 17930 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/19/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/22/2019Treatment End Date:N/A
Treatment Summary:8378-8494;8778-8854;15690-17930
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8378 ft.# Of Holes:1440
Interval Bottom:17930 ft.Hole Size:0.38 in.

Formation NFCC                     Formation Classification:  OW                     Status:  PR - 10/1/2022                 Interval Top: 8378 ft.    Interval Bottom: 17930 ft.

 Completed Information for Formation NIOBRARA-FORT HAYS-CODELL-CARLILE
1st Production Date:4/19/2019Choke Size: 
Formation Name:NIOBRARA-FORT HAYS-CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/18/2019Treatment End Date:4/3/2019
Treatment Summary:541,913# 100 Mesh Sand; 8,907,448# 20/40 Sand; 165,101 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):165101Max pressure during treatment (psi):4835
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14741
Fresh water used in treatment (bbls):165101Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9449361Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7986 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 8806
BBLS_OIL 682
BTU_GAS 1341
CALC_BBLS_H2O 8806
CALC_BBLS_OIL 682
CALC_GOR 981
CALC_MCF_GAS 669
CASING_PRESS 3000
GRAVITY_OIL 42
MCF_GAS 669
TUBING_PRESS 1900
Perforation Data:
Interval Top:8378 ft.# Of Holes:1440
Interval Bottom:17930 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)13763
Total Gas Produced (MCF)100857
GOR7328
GOR DeterminationBOE
Average BOE per Day85.746
Average MCFE per Day497.334

 Federal Financial Assurance  i 

 Tribal Well  i No