Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10091
Well Classification: OW Status: PR - 12/1/2022
Well Name/No:B-Farm LD #18-037HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2022
FacilityID:452910LocationID:452914
County:ADAMS #001Location:NENW 7 1S67W 6
Field:WATTENBERG - #90750Elevation:5125 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:884FNL  1842 FWLLat/Long: 39.983928 / -104.933672Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.983926 / -104.933670Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/10/2018
End Date: 3/19/2018
Reported: 4/3/2018
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2022             Measured TD: 14122 ft.    Vertical TD: 7965 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/4/2019
Proposed Top PZ Location:Sec:7 Twp: 1S 67W Footage: 595 FNL  872 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67W Footage: 413 FNL  891 FEL
Proposed Depth/Form:13959 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13959 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1689, Top: 0 ft., Bottom: 13959 ft.

Wellbore Completed
Completion Date:1/29/2018
Spud Date:12/29/2017Spud Date Is:ACTUAL
Measured TD:14122 ft.Measured PB depth:14113 ft.
True Vertical TD:7965 ft.True Vertical PB depth:7965 ft.
Top PZ Location:Sec:7 Twp: 1S 67WFootage: 595 FNL  872 FEL
Bottom Hole Location:Sec:18 Twp: 1S 67WFootage: 413 FNL  891 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Composite 001-10098)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1721 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 1721 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14122 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2341, Top: 3070 ft., Bottom: 14122 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3563 ft.3717 ft.NN
SUSSEX5081 ft.5349 ft.NN
SHANNON6303 ft.6559 ft.NN
SHARON SPRINGS7959 ft.NN
NIOBRARA8083 ft.NN
FORT HAYS8728 ft.NN
CODELL8849 ft.NN
CARLILE9180 ft.NN

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 9180 ft.    Interval Bottom: 9306 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/11/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Carlile perf interval: 9180' - 9306'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9180 ft.# Of Holes:750
Interval Bottom:9306 ft.Hole Size:0.38 in.

Formation CD-CRL                 Formation Classification:  OW                 Status:  PR - 12/1/2022                 Interval Top: 9031 ft.    Interval Bottom: 13983 ft.

 Completed Information for Formation CODELL-CARLILE
1st Production Date:4/11/2018Choke Size: 
Formation Name:CODELL-CARLILECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/10/2018Treatment End Date:3/19/2018
Treatment Summary:270,310 lbs 100 Mesh Sand; 4,756,199 lbs 20/40 Sand; 84,169 bbls Gelled Fluid. Flowback determined from well test separator
Total fluid used in treatment (bbls):84169Max pressure during treatment (psi):4561
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:25
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):10673
Fresh water used in treatment (bbls):84169Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5026509Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8408 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 386
BBLS_OIL 417
BTU_GAS 1362
CALC_BBLS_H2O 386
CALC_BBLS_OIL 417
CALC_GOR 1599
CALC_MCF_GAS 667
CASING_PRESS 2000
GRAVITY_OIL 45
MCF_GAS 667
TUBING_PRESS 1500
Perforation Data:
Interval Top:9031 ft.# Of Holes:750
Interval Bottom:13983 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/10/2020                 Interval Top: 9031 ft.    Interval Bottom: 13983 ft.

 Completed Information for Formation CODELL
1st Production Date:4/11/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:2/10/2020Treatment End Date:N/A
Treatment Summary:Codell perf interval: 9031' - 9179', 9307' - 13983'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9031 ft.# Of Holes:750
Interval Bottom:13983 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)2029
Total Gas Produced (MCF)38671
GOR19059
GOR DeterminationMCFE
Average BOE per Day23.987
Average MCFE per Day139.101

 Federal Financial Assurance  i 

 Tribal Well  i No