Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10069
Well Classification: OW Status: PR - 9/4/2021
Well Name/No:Prairie LE #17-013HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/4/2021
FacilityID:450940LocationID:450942
Municipality/County:BRIGHTON / ADAMS #001Location:SESW 20 1S66W 6
Field:WATTENBERG - #90750Elevation:5047 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:477FSL  1362 FWLLat/Long: 39.944637 / -104.803970Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.944637 / -104.803969Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/24/2021
End Date: 7/12/2021
Reported: 7/27/2021
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/4/2021             Measured TD: 17898 ft.    Vertical TD: 7493 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/4/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:1/9/2023
Proposed Top PZ Location:Sec:20 Twp: 1S 66W Footage: 460 FSL  1955 FWL
Bottom Hole Location:Sec:17 Twp: 1S 66W Footage: 150 FNL  1955 FWL
Proposed Depth/Form:18278 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2901 , Unit Acreage: 640, Drill Unit: Sec 17, 20 W 1/2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18278 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2317, Top: , Bottom: 18278 ft.

Wellbore Completed
Completion Date:4/17/2021
Spud Date:2/11/2021Spud Date Is:ACTUAL
Measured TD:17898 ft.Measured PB depth:17893 ft.
True Vertical TD:7493 ft.True Vertical PB depth:7493 ft.
Top PZ Location:Sec:20 Twp: 1S 66WFootage: 536 FSL  1957 FWL
Bottom Hole Location:Sec:17 Twp: 1S 66WFootage: 297 FNL  1944 FWL
Log Types:Mud log, MWD/LWD, CBL (Composite in 001-10066
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2029 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2029 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17898 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2375, Top: 4960 ft., Bottom: 17898 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4518 ft.4682 ft.NN
SUSSEX4921 ft.5111 ft.NN
SHANNON5604 ft.5826 ft.NN
SHARON SPRINGS7162 ft.NN
NIOBRARA7523 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 9/4/2021                  Interval Top: 8166 ft.    Interval Bottom: 17672 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/30/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/24/2021Treatment End Date:7/12/2021
Treatment Summary:1,762 bbls 15% HCL Acid; 582,330 # 100 Mesh Sand; 6,584,740 # 20/40 Sand; 177,711 bbls Gelled Fluid; Flowback determind from well test separator
Total fluid used in treatment (bbls):179473Max pressure during treatment (psi):4533
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):1762Min frac gradient (psi/ft):0.74
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):26133
Fresh water used in treatment (bbls):177711Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7167070Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7783 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 599
BBLS_OIL 384
BTU_GAS 1542
CALC_BBLS_H2O 599
CALC_BBLS_OIL 384
CALC_GOR 586
CALC_MCF_GAS 225
CASING_PRESS 1934
GRAVITY_OIL 43
MCF_GAS 225
TUBING_PRESS 1310
Perforation Data:
Interval Top:8166 ft.# Of Holes:960
Interval Bottom:17672 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)7500
Total Gas Produced (MCF)18300
GOR2440
GOR DeterminationBOE
Average BOE per Day29.137
Average MCFE per Day168.996

 Federal Financial Assurance  i 

 Tribal Well  i No