Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10039
Well Classification: OW Status: PR - 4/1/2023
Well Name/No:PC 1S-66-2928 #20CDH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2023
FacilityID:450052LocationID:450043
County:ADAMS #001Location:NWSW 29 1S66W 6
Field:WATTENBERG - #90750Elevation:5066 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1607FSL  1325 FWLLat/Long: 39.933280 / -104.804200Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.933349 / -104.804199Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/5/2019
End Date: 1/14/2019
Reported: 2/6/2019
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2023             Measured TD: 17875 ft.    Vertical TD: 7716 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:4/21/2019
Proposed Top PZ Location:Sec:29 Twp: 1S 66W Footage: 0 FSL  500 FWL
Bottom Hole Location:Sec:28 Twp: 1S 66W Footage: 0 FSL  500 FEL
Proposed Depth/Form:17940 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17940 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2395, Top: 1500 ft., Bottom: 17940 ft.

Wellbore Completed
Completion Date:9/21/2018
Spud Date:8/8/2018Spud Date Is:ACTUAL
Measured TD:17875 ft.Measured PB depth:17870 ft.
True Vertical TD:7716 ft.True Vertical PB depth:7716 ft.
Top PZ Location:Sec:32 Twp: 1S 66WFootage: 10 FNL  524 FWL
Bottom Hole Location:Sec:33 Twp: 1S 66WFootage: 26 FNL  551 FEL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 001-10041).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1633 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1633 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17875 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2840, Top: 115 ft., Bottom: 17875 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4736 ft.NN
SUSSEX5137 ft.NN
SHANNON5840 ft.NN
SHARON SPRINGS7671 ft.NN
NIOBRARA7712 ft.NN
FORT HAYS8286 ft.NN
CODELL8394 ft.NN
CARLILE13609 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/22/2019                 Interval Top: 13631 ft.    Interval Bottom: 14614 ft.

 Completed Information for Formation CARLILE
1st Production Date:3/11/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/5/2019Treatment End Date:1/14/2019
Treatment Summary:Perforated Interval: 13631'-14614'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13631 ft.# Of Holes:120
Interval Bottom:14614 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/22/2019                 Interval Top: 8400 ft.    Interval Bottom: 17703 ft.

 Completed Information for Formation CODELL
1st Production Date:3/11/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/5/2019Treatment End Date:1/14/2019
Treatment Summary:Perforated Intervals: 8400'-9207'; 10305'-13608'; 14637'-17703'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8400 ft.# Of Holes:864
Interval Bottom:17703 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/1/2023                  Interval Top: 8352 ft.    Interval Bottom: 17823 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/11/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/5/2019Treatment End Date:1/14/2019
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with a 48-stage plug-and-perf; 153767 total bbls fluid pumped: 137793 bbls gelled fluid, 15959 bbls fresh water, and 15 bbls 28% HCl acid; 9552186 total proppant pumped: all 30/50 mesh sand.
Total fluid used in treatment (bbls):153767Max pressure during treatment (psi):8710
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):15Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13214
Fresh water used in treatment (bbls):15959Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9552186Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8283 ft.
Tubing Packer Depth:8267 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 316
BBLS_OIL 844
BTU_GAS 1485
CALC_BBLS_H2O 316
CALC_BBLS_OIL 844
CALC_GOR 924
CALC_MCF_GAS 780
CASING_PRESS 1107
GRAVITY_OIL 40
MCF_GAS 780
TUBING_PRESS 1517
Perforation Data:
Interval Top:8352 ft.# Of Holes:1129
Interval Bottom:17823 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/22/2019                 Interval Top: 8352 ft.    Interval Bottom: 17823 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/11/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/5/2019Treatment End Date:1/14/2019
Treatment Summary:Perforated Intervals: 8352'-8377'; 9228'-10282'; 17726'-17823'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8352 ft.# Of Holes:145
Interval Bottom:17823 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9028
Total Gas Produced (MCF)48936
GOR5420
GOR DeterminationBOE
Average BOE per Day47.649
Average MCFE per Day276.385

 Federal Financial Assurance  i 

 Tribal Well  i No