Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09966
Well Classification: OW Status: PR - 4/1/2022
Well Name/No:Seltzer LD #21-032HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2022
FacilityID:447396LocationID:320515
County:ADAMS #001Location:NWNE 4 1S67W 6
Field:WATTENBERG - #90750Elevation:5145 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:468FNL  2251 FELLat/Long: 39.999072 / -104.892422Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.999072 / -104.892423Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/18/2018
End Date: 1/13/2019
Reported: 2/4/2019
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2022             Measured TD: 23500 ft.    Vertical TD: 7563 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/24/2020
Proposed Top PZ Location:Sec:4 Twp: 1S 67W Footage: 561 FNL  2241 FEL
Bottom Hole Location:Sec:21 Twp: 1S 67W Footage: 556 FNL  2277 FEL
Proposed Depth/Form:23448 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1040, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 80, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 707, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23448 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3092, Top: 0 ft., Bottom: 23448 ft.
Casing:String Type: 1ST LINER, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12105 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1094, Top: 1500 ft., Bottom: 12105 ft.

Wellbore Completed
Completion Date:11/7/2018
Spud Date:10/1/2018Spud Date Is:ACTUAL
Measured TD:23500 ft.Measured PB depth:23490 ft.
True Vertical TD:7563 ft.True Vertical PB depth:7563 ft.
Top PZ Location:Sec:4 Twp: 1S 67WFootage: 561 FNL  2241 FEL
Bottom Hole Location:Sec:21 Twp: 1S 67WFootage: 556 FNL  2277 FEL
Log Types:Mud, MWD/LWD, CBL, (Composite in 001-09962)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1744 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 760, Top: 0 ft., Bottom: 1744 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23500 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2965, Top: 2950 ft., Bottom: 23500 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4531 ft.4697 ft.NN
SUSSEX4996 ft.5119 ft.NN
SHANNON5498 ft.5619 ft.NN
SHARON SPRINGS7520 ft.NN
NIOBRARA7700 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2022                  Interval Top: 7916 ft.    Interval Bottom: 23167 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/14/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/18/2019Treatment End Date:1/13/2019
Treatment Summary:2,857 bbls 15% HCL Acid; 1,169,771# 100 Mesh Sand; 13,082,194# 20/40 Sand; 382,356 bbls Gelled Fluid; Flowback determind from well test separator
Total fluid used in treatment (bbls):385213Max pressure during treatment (psi):5395
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:98
Total acid used in treatment (bbls):2857Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):28076
Fresh water used in treatment (bbls):382356Disposition method For flowback:DISPOSAL
Total proppant used (lbs):14251965Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7630 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/16/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 864
BBLS_OIL 277
BTU_GAS 1322
CALC_BBLS_H2O 864
CALC_BBLS_OIL 277
CALC_GOR 2025
CALC_MCF_GAS 561
CASING_PRESS 2600
GRAVITY_OIL 42
MCF_GAS 561
TUBING_PRESS 1800
Perforation Data:
Interval Top:7916 ft.# Of Holes:2548
Interval Bottom:23167 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)11970
Total Gas Produced (MCF)159335
GOR13311
GOR DeterminationBOE
Average BOE per Day108.111
Average MCFE per Day627.083

 Federal Financial Assurance  i 

 Tribal Well  i No