Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-09901
Well Classification: OW Status: PR - 9/26/2021
Well Name/No:Ivey LC #26-365HC
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/26/2021
FacilityID:444005LocationID:442411
County:ADAMS #001Location:SWSE 11 1S68W 6
Field:WATTENBERG - #90750Elevation:5107 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1120FSL  1715 FELLat/Long: 39.975096 / -104.965539Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.975092 / -104.965541Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/15/2021
End Date: 8/29/2021
Reported: 9/13/2021
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/26/2021             Measured TD: 23754 ft.    Vertical TD: 7978 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/26/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/9/2022
Proposed Top PZ Location:Sec:14 Twp: 1S 68W Footage: 460 FNL  1328 FEL
Bottom Hole Location:Sec:26 Twp: 1S 68W Footage: 292 FSL  1330 FEL
Proposed Depth/Form:23605 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CARL , Formation: CARLILE , Order: 407-3711 , Unit Acreage: 960, Drill Unit: Sec. 14,23,26: E/2
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-3711 , Unit Acreage: 960, Drill Unit: Sec. 14,23,26: E/2
Formation And Spacing:Code: FTHYS , Formation: FORT HAYS , Order: 407-3711 , Unit Acreage: 960, Drill Unit: Sec. 14,23,26: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 554, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 717, Top: 0 ft., Bottom: 1700 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23605 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 3219, Top: , Bottom: 23605 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7186 ft., Depth: 16389 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:2/19/2021
Spud Date:12/16/2020Spud Date Is:ACTUAL
Measured TD:23754 ft.Measured PB depth:23749 ft.
True Vertical TD:7978 ft.True Vertical PB depth:7978 ft.
Top PZ Location:Sec:14 Twp: 1S 68WFootage: 460 FNL  1328 FEL
Log Types:Mud log, MWD/LWD, CBL (Composite in 001-09900)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2050 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 895, Top: 0 ft., Bottom: 2050 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 23754 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3320, Top: 4000 ft., Bottom: 23754 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4485 ft.4648 ft.NN
SUSSEX4874 ft.5057 ft.NN
SHANNON5287 ft.5346 ft.NN
SHARON SPRINGS7612 ft.NN
NIOBRARA7810 ft.NN
FORT HAYS8444 ft.NN
CODELL8568 ft.NN
CARLILE9721 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/1/2024                 Interval Top: 11568 ft.    Interval Bottom: 23524 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/22/2021Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/1/2024Treatment End Date:N/A
Treatment Summary:Fort Hays perf intervals: 11568-11675, 14086-14260, 19808-19886, 22654-23524
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:11568 ft.# Of Holes:1776
Interval Bottom:23524 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 10/1/2024                 Interval Top: 9721 ft.    Interval Bottom: 20047 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/22/2021Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/1/2024Treatment End Date:N/A
Treatment Summary:Carlile perf intervals: 9721-10550, 19887-20047
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:9721 ft.# Of Holes:1776
Interval Bottom:20047 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 9/26/2021                 Interval Top: 8723 ft.    Interval Bottom: 23524 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:9/22/2021Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/15/2021Treatment End Date:8/29/2021
Treatment Summary:226 bbls 15% HCL Acid; 791,023 # 100 Mesh Sand; 10,273,933 # 20/40 Sand; 267,630 bbls gelled fluid; Flowback determined from well test separator.
Total fluid used in treatment (bbls):267856Max pressure during treatment (psi):4652
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:74
Total acid used in treatment (bbls):226Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):21667
Fresh water used in treatment (bbls):267630Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11064956Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8297 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/26/2021Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 454
BBLS_OIL 324
BTU_GAS 1398
CALC_BBLS_H2O 454
CALC_BBLS_OIL 324
CALC_GOR 1898
CALC_MCF_GAS 615
CASING_PRESS 3135
GRAVITY_OIL 45
MCF_GAS 615
TUBING_PRESS 2444
Perforation Data:
Interval Top:8723 ft.# Of Holes:1776
Interval Bottom:23524 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/1/2024                 Interval Top: 8723 ft.    Interval Bottom: 22653 ft.

 Completed Information for Formation CODELL
1st Production Date:9/22/2021Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:10/1/2024Treatment End Date:N/A
Treatment Summary:Codell perf intervals:8723-9720, 10551-11567, 11676-14085, 14261-19807, 20048-22653
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8723 ft.# Of Holes:1776
Interval Bottom:22653 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)12385
Total Gas Produced (MCF)361295
GOR29171
GOR DeterminationMCFE
Average BOE per Day204.515
Average MCFE per Day1186.187

 Federal Financial Assurance  i 

 Tribal Well  i No