|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 5/11/2023 Measured TD: 12370 ft. Vertical TD: 7769 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 5/11/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 11/28/2015 | Proposed Top PZ Location: | Sec:36 Twp: 1S 66W | Footage: 1100 FNL 494 FWL | Bottom Hole Location: | Sec:36 Twp: 1S 66W | Footage: 854 FNL 504 FEL | Proposed Depth/Form: | 12347 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-800 , Unit Acreage: 640, Drill Unit: Sec. 36:All | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 65 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 60 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1490 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 430, Top: 0 ft., Bottom: 1490 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 8100 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 570, Top: 600 ft., Bottom: 8100 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7400 ft., Depth: 12347 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 3/17/2014 | Spud Date: | 1/29/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12370 ft. | Measured PB depth: | 12370 ft. | True Vertical TD: | 7769 ft. | True Vertical PB depth: | 7769 ft. | Top PZ Location: | Sec:36 Twp: 1S 66W | Footage: 1100 FNL 494 FWL | Bottom Hole Location: | Sec:36 Twp: 1S 66W | Footage: 854 N 504 E | Log Types: | Mud Log, CBL, MWD/LWD, (RES on 001-09785). | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1508 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 522, Top: 0 ft., Bottom: 1510 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7825 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 650, Top: 0 ft., Bottom: 7825 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7221 ft., Depth: 12360 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | SHANNON | 4951 ft. | | | | SHARON SPRINGS | 7281 ft. | | | | NIOBRARA | 7394 ft. | | | | CODELL | 7880 ft. | | | |
Formation CODL Formation Classification: OW Status: AB - 5/11/2023 Interval Top: 8058 ft. Interval Bottom: 12370 ft. Completed Information for Formation CODELL | 1st Production Date: | 6/24/2014 | Choke Size: | | Formation Name: | CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 6/6/2014 | Treatment End Date: | 6/9/2014 | Treatment Summary: | 18-stage completion using sliding sleeves and casing packers;
66739 total bbls fluid pumped: 885 bbls fresh water, 60 bbls 15% HCl acid, and 65794 bbls gelled fluid;
3709947 total lbs proppant pumped: 238392 lbs 40/70 sand, 107627 lbs 100 mesh, and 3363928 lbs 20/40 sand. | Total fluid used in treatment (bbls): | 66739 | Max pressure during treatment (psi): | 8808 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | 18 | Total acid used in treatment (bbls): | 60 | Min frac gradient (psi/ft): | 0.90 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 7554 | Fresh water used in treatment (bbls): | 885 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3709947 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7311 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/20/2014 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | FLARED | |
Test Type | Measure |
---|
BBLS_H2O | 426 | BBLS_OIL | 311 | BTU_GAS | 1400 | CALC_BBLS_H2O | 426 | CALC_BBLS_OIL | 311 | CASING_PRESS | 300 | GRAVITY_OIL | 39 | TUBING_PRESS | 220 |
| Perforation Data: | Interval Top: | 8058 ft. | # Of Holes: | | Interval Bottom: | 12370 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 05/11/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2029 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|