|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/18/2024 Measured TD: 8313 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/18/2024 | | Wellbore Permit | DRIFTED | | Permit #: | 20073191 | Expiration Date: | 8/14/2008 | | Proposed Depth/Form: | 8300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: W2 |
| | |
| Wellbore Completed | | Completion Date: | 9/27/2007 | | Spud Date: | 9/21/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8313 ft. | Measured PB depth: | 8274 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CEMENT BOND, COMP DENS/DUAL IND/GAMMA RAY | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1526 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 1526 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8293 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6632 ft., Bottom: 8293 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7300 ft. | | N | N | | J SAND | 8118 ft. | 8182 ft. | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/18/2024 Interval Top: 8118 ft. Interval Bottom: 8166 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 10/23/2007 | Choke Size: | 0.450 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/10/2007 | | Treatment Summary: | VOLUMES: PAD VOL 182 BBL CROSSLINDED (LIGHTNING PAD 103BBLS.) SLF 651 BBLS CROSSLINDED PROPPANT: 141,020 LBS 20/20; 12,000 12/20SB SB; AVERAGE PRESSURE 4230, FLUSH 126.2BBLS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/10/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 3 | | BTU_GAS | 811 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 50000 | | CALC_MCF_GAS | 150 | | CASING_PRESS | 200 | | MCF_GAS | 150 |
| | Perforation Data: | | Interval Top: | 8118 ft. | # Of Holes: | 83 | | Interval Bottom: | 8166 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/18/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2027 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|