|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/7/2016 Measured TD: 8517 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/7/2016 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 10/13/2010 | | Proposed Depth/Form: | 8510 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: DKJCD , Formation: DAKOTA-J-CODELL , Order: 318A , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 208 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 10 ft., Bottom: 208 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8494 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 7756 ft., Bottom: 8494 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: 120, Top: 7200 ft., Bottom: 7756 ft. | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: 150, Top: 4600 ft., Bottom: 5200 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 12/12/1970 | Spud Date Is: | ACTUAL | | Measured TD: | 8517 ft. | Measured PB depth: | 8422 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | IES, FORMATION DENSITY, NEUTRON POROSITY CORRELATION, GAMMA RAY | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 208 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 208 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8501 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7756 ft., Bottom: 8501 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: 4.5 in., Top: 0 ft., Depth: 1085 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 276 ft., Bottom: 1085 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 1007 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 190 ft., Bottom: 1170 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 300 ft., Depth: 1010 ft., Bottom: 1170 ft., Sacks: 250, Method: STAGE TOOL | | Additional Cement: | String Type: 1ST , Top: 4600 ft., Depth: 5320 ft., Bottom: 5324 ft., Sacks: 250, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4300 ft., Depth: 4560 ft., Bottom: 4600 ft., Sacks: 250, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 1050 ft. | | | | | SUSSEX | 4840 ft. | | | | | SHANNON | 5530 ft. | | | | | NIOBRARA | 7460 ft. | | | | | CODELL | 7908 ft. | | | | | MUDDY J | 8347 ft. | | | |
Formation JSND Formation Classification: OG Status: AB - 4/7/2016 Interval Top: 8347 ft. Interval Bottom: 8369 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/10/1971 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2012 | | Treatment Summary: | REMOVED CIBP SET @ 8310-8313 TO COMMINGLE WITH NB/CD | | Formation Treatment | | Treatment Date: | 2/24/2010 | | Treatment Summary: | SET COMPOSITE PLUG @ 7980' FOR MECHANICAL INTEGRITY. OUR INTENT IS TO DRILL OUT THE PLUG COJMMINGLE THE WELL IN THE NEXT SIX MONTHS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CASING_PRESS | 150 | | MCF_GAS | 180 | | TUBING_PRESS | 12 |
| | Perforation Data: | | Interval Top: | 8347 ft. | # Of Holes: | 30 | | Interval Bottom: | 8369 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OG Status: CM - 4/27/1999 Interval Top: 7908 ft. Interval Bottom: 7928 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/24/1995 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/1/2010 | | Treatment Summary: | Re-Frac Codell down 2-7/8" Tbg w/ Pkr ^ Nio w/ 171,780 gal Slickwater w/ 115,440# 40/70 , 4,000# 20/40 SB Excel
Commingle with Niobrara production 3/3/2010 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 16 | | CALC_GOR | 687.5 | | CASING_PRESS | 1039 | | MCF_GAS | 11 | | TUBING_PRESS | 1059 |
| | Perforation Data: | | Interval Top: | 7908 ft. | # Of Holes: | 80 | | Interval Bottom: | 7928 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 6/12/1996 Interval Top: 7908 ft. Interval Bottom: 8369 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 6/12/1996 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8334 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/12/1996 | Test Method: | FLOWING | | Hours Tested: | 72 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 1440 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 20 | | CALC_GOR | 800 | | CALC_MCF_GAS | 16 | | MCF_GAS | 1152 |
| | Perforation Data: | | Interval Top: | 7908 ft. | # Of Holes: | | | Interval Bottom: | 8369 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: OG Status: CM - 2/25/2012 Interval Top: 7480 ft. Interval Bottom: 8369 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 2/21/2012 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/16/2012 | | Treatment Summary: | REMOVED CIBP SET @ 8310-8313 TO COMMINGLE WITH NB/CD |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/25/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 2 | | BTU_GAS | 1293 | | CALC_BBLS_OIL | 2 | | CALC_GOR | 9000 | | CALC_MCF_GAS | 18 | | CASING_PRESS | 900 | | GRAVITY_OIL | 48 | | MCF_GAS | 18 |
| | Perforation Data: | | Interval Top: | 7480 ft. | # Of Holes: | 178 | | Interval Bottom: | 8369 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/7/2016 Interval Top: 7480 ft. Interval Bottom: 7928 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 3/3/2010 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/1/2010 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7879 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/25/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1264 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 143 | | CALC_GOR | 944 | | CALC_MCF_GAS | 135 | | CASING_PRESS | 680 | | GRAVITY_OIL | 43 |
| | Perforation Data: | | Interval Top: | 7480 ft. | # Of Holes: | 148 | | Interval Bottom: | 7928 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 4/27/1999 Interval Top: 7480 ft. Interval Bottom: 7760 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 3/30/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/1/2010 | | Treatment Summary: | FRAC NB W/500 GAL 15% & 249,610 GAL SW W/ 201,620# 40/70 & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7480 ft. | # Of Holes: | 68 | | Interval Bottom: | 7760 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/07/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|