Drilling Plans and Procedures:
Complete section with drilling date and contractor if known at time of application
If H2S is expected additional information is required (Rule 607)
If oil or salt based mud is to be used the drilling pit shall be permitted or lined (Rule 903)
Use Sensitive Area Guidance Document (appendix 2)