|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 7/1/2024 Measured TD: 12700 ft. Vertical TD: 12619 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 7/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20042087 | Expiration Date: | 9/27/2005 | Prop Depth/Form: | 13300 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | PICEANCE CREEK | Unit Number: | COC47666X | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 6/14/2005 | Spud Date: | 5/19/2005 | Spud Date Is: | ACTUAL | Measured TD: | 12700 ft. | Measured PB depth: | 12605 ft. | True Vertical TD: | 12619 ft. | True Vertical PB depth: | 12525 ft. | Top PZ Location: | Sec:2 Twp: 2S 97W | Footage: 164 FSL 248 FWL | Depth | Bottom Hole Location: | Sec:2 Twp: 2S 97W | Footage: 165 FSL 248 FWL | Depth | Log Types: | CBL, GR | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 14 in., Top: 0 ft., Depth: 130 ft., Weight: 40 , Citings Type: ACTUAL | Cement: | Sacks: 122, Top: 0 ft., Bottom: 130 ft., Determination Method: | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 3850 ft., Weight: 45.5 , Citings Type: ACTUAL | Cement: | Sacks: 2329, Top: 0 ft., Bottom: 3850 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 0 ft., Depth: 8100 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 1225, Top: 2820 ft., Bottom: 8100 ft., Determination Method: | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12696 ft., Weight: 15.1 , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 6000 ft., Bottom: 12696 ft., Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH G | 5490 ft. | 7237 ft. | N | N | OHIO CREEK | 7237 ft. | 7449 ft. | N | N | WILLIAMS FORK - CAMEO | 7449 ft. | 11453 ft. | N | N | ROLLINS | 11453 ft. | 11650 ft. | N | N | COZZETTE | 11650 ft. | 11937 ft. | N | N | CORCORAN | 11937 ft. | 12700 ft. | N | N |
Formation CRCRN Formation Classification: GW Status: SI - 7/1/2024 Interval Top: 11970 ft. Interval Bottom: 12496 ft. Completed Information for Formation CORCORAN | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | CORCORAN | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/14/2005 | Treatment Summary: | FRAC WITH 224,500 LBS 30/50 API SAND AND 159,870 GALS GEL FLUID. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11418 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/1/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 2 | MCF_GAS | 273 |
| Perforation Data: | Interval Top: | 11970 ft. | # Of Holes: | 72 | Interval Bottom: | 12496 ft. | Hole Size: | 0.32 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 4/1/2024 Interval Top: 11911 ft. Interval Bottom: 11915 ft. Completed Information for Formation COZZETTE | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | COZZETTE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/14/2005 | Treatment Summary: | PLUG SET AT 11940. FRAC WITH 21,100 LBS 30/50 API SAND AND 23,620 GALS GEL FLUID. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11418 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/1/2005 | Test Method: | FLOIWNG | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 1 | MCF_GAS | 103 |
| Perforation Data: | Interval Top: | 11911 ft. | # Of Holes: | 12 | Interval Bottom: | 11915 ft. | Hole Size: | 0.32 in. |
|
Formation RLNS Formation Classification: GW Status: SI - 4/1/2024 Interval Top: 11602 ft. Interval Bottom: 11606 ft. Completed Information for Formation ROLLINS | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | ROLLINS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/14/2005 | Treatment Summary: | FRAC WITH 34,500 LBS 30/50 API SAND AND 24,950 GALS GEL FLUID. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11418 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/1/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
MCF_GAS | 70 |
| Perforation Data: | Interval Top: | 11602 ft. | # Of Holes: | 12 | Interval Bottom: | 11606 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 7/1/2024 Interval Top: 7534 ft. Interval Bottom: 11404 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | N/A | Choke Size: | 0.250 in. | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/14/2005 | Treatment Summary: | PLUGS SET AT 11315, 10544,10037, 9400, 8670 AND 8200. FRAC WITH 1,326,795 LBS 30/50 API AND 30/70 BRADY SAND AND 791,941 GALS GEL FLUID. ALL PLUGS DRILLED OUT AFTER FRAC JOB COMPLETE. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11418 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/1/2005 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 10 | MCF_GAS | 1431 |
| Perforation Data: | Interval Top: | 7534 ft. | # Of Holes: | 456 | Interval Bottom: | 11404 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 08/2023 - 07/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 88 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.041 |
Average MCFE per Day | 0.241 |
Federal Financial Assurance | i | Y |
|
|