|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 8/1/2024 Measured TD: 12740 ft. Vertical TD: 12540 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 8/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20042086 | Expiration Date: | 9/27/2005 | Prop Depth/Form: | 13300 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | PICEANCE CREEK | Unit Number: | COC47666X | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 5/15/2005 | Spud Date: | 4/16/2005 | Spud Date Is: | ACTUAL | Measured TD: | 12740 ft. | Measured PB depth: | 12694 ft. | True Vertical TD: | 12540 ft. | True Vertical PB depth: | 12494 ft. | Top PZ Location: | Sec:2 Twp: 2S 97W | Footage: 648 FSL 1042 FWL | Depth | Bottom Hole Location: | Sec:2 Twp: 2S 97W | Footage: 648 FSL 1042 FWL | Depth | Log Types: | GR/CCL | Casing: | String Type: CONDUCTOR, Hole Size: 17.5 in., Size: 14 in., Top: 0 ft., Depth: 130 ft., Weight: 55 , Citings Type: ACTUAL | Cement: | Sacks: 45, Top: 0 ft., Bottom: 130 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 1292 ft., Depth: 3823 ft., Weight: 45.5 , Citings Type: ACTUAL | Cement: | Sacks: 1455, Top: 1292 ft., Bottom: 3823 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 7416 ft., Depth: 8224 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 813, Top: 7416 ft., Bottom: 8224 ft., Determination Method: CALC | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12740 ft., Weight: 15.1 , Citings Type: ACTUAL | Cement: | Sacks: 530, Top: 6000 ft., Bottom: 12740 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH | 5490 ft. | 7370 ft. | N | N | OHIO CREEK | 7370 ft. | 7585 ft. | N | N | WILLIAMS FORK - CAMEO | 7585 ft. | 11600 ft. | N | N | ROLLINS | 11600 ft. | 11791 ft. | N | N | COZZETTE | 11791 ft. | 12084 ft. | N | N | CORCORAN | 12084 ft. | 12740 ft. | N | N |
Formation CRCRN Formation Classification: GW Status: SI - 8/1/2024 Interval Top: 12096 ft. Interval Bottom: 12610 ft. Completed Information for Formation CORCORAN | 1st Production Date: | N/A | Choke Size: | 1.000 in. | Formation Name: | CORCORAN | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2005 | Treatment Summary: | FRAC WITH 184,990 GALS GEL FLUID AND 223,200# 30/50 API SAND. PLUG SET AT 12126'. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11528 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/25/2005 | Test Method: | FLOWING TEST | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 54 | BBLS_OIL | 0 | CASING_PRESS | 0 | MCF_GAS | 380 | TUBING_PRESS | 1032 |
| Perforation Data: | Interval Top: | 12096 ft. | # Of Holes: | 84 | Interval Bottom: | 12610 ft. | Hole Size: | 0.32 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 8/1/2024 Interval Top: 11910 ft. Interval Bottom: 12045 ft. Completed Information for Formation COZZETTE | 1st Production Date: | N/A | Choke Size: | 1.000 in. | Formation Name: | COZZETTE | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2005 | Treatment Summary: | FRAC WITH 32,680 GALS GEL FLUID AND 43,000# 30/50 API SAND |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11528 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/25/2005 | Test Method: | FLOWING TEST | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 24 | BBLS_OIL | 0 | CASING_PRESS | 0 | MCF_GAS | 170 | TUBING_PRESS | 1032 |
| Perforation Data: | Interval Top: | 11910 ft. | # Of Holes: | 24 | Interval Bottom: | 12045 ft. | Hole Size: | 0.32 in. |
|
Formation RLNS Formation Classification: GW Status: SI - 8/1/2024 Interval Top: 11720 ft. Interval Bottom: 11783 ft. Completed Information for Formation ROLLINS | 1st Production Date: | N/A | Choke Size: | 1.000 in. | Formation Name: | ROLLINS | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2005 | Treatment Summary: | FRAC WITH 50,560 GALS GEL FLUID AND 73,700# 30/50 API SAND |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11528 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/25/2005 | Test Method: | FLOWING TEST | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 16 | BBLS_OIL | 0 | CASING_PRESS | 0 | MCF_GAS | 111 | TUBING_PRESS | 1032 |
| Perforation Data: | Interval Top: | 11720 ft. | # Of Holes: | 24 | Interval Bottom: | 11783 ft. | Hole Size: | 0.32 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 8/1/2024 Interval Top: 7610 ft. Interval Bottom: 11400 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | N/A | Choke Size: | 1.000 in. | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2005 | Treatment Summary: | FRAC WITH 786,392 GALS GEL FLUID AND 1,314,439# 30/50 API AND 30/70 BRADY SAND. PLUGS SET AT 11314,10612, 9963, 9580, 8970, AND 7730 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11528 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/25/2005 | Test Method: | FLOWING TEST | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 329 | BBLS_OIL | 0 | CASING_PRESS | 0 | MCF_GAS | 2327 | TUBING_PRESS | 1032 |
| Perforation Data: | Interval Top: | 7610 ft. | # Of Holes: | 380 | Interval Bottom: | 11400 ft. | Hole Size: | 0.32 in. |
|
Formation OHCRK Formation Classification: GW Status: SI - 8/1/2024 Interval Top: 7396 ft. Interval Bottom: 7532 ft. Completed Information for Formation OHIO CREEK | 1st Production Date: | N/A | Choke Size: | 1.000 in. | Formation Name: | OHIO CREEK | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2005 | Treatment Summary: | PLUG SET AT 7560'. FRAC WITH 93,884 GALS GEL FLUID AND 186,188# 30/70 BRADY SAND. ALL PLUGS DRILLED OUT AT END OF FRAC JOB |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11528 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/25/2005 | Test Method: | FLOWING TEST | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 18 | BBLS_OIL | 0 | CASING_PRESS | 0 | MCF_GAS | 125 | TUBING_PRESS | 1032 |
| Perforation Data: | Interval Top: | 7396 ft. | # Of Holes: | 36 | Interval Bottom: | 7532 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 135 |
Total Gas Produced (MCF) | 6983 |
GOR | 51725 |
GOR Determination | MCFE |
Average BOE per Day | 3.721 |
Average MCFE per Day | 21.581 |
Federal Financial Assurance | i | Y |
|
|