LOCATION456114Duck Club
Pad
EXTRACTION OIL & GAS INC
10459
AC
9/1/2023
WATTENBERG
90750
ADAMS  001
NWSW 12 1S66W 6
456114View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
401487889
01/09/2018
Location lies within proximity of a Surface Water Feature. Operator shall use tertiary containment along the cross- and down-gradient perimeters of the Location.
OGLAForm: (02A)
401487889
05/22/2018
Green Completions -Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, the operator shall not produce the wells without an approved variance per Rule 805.b.(3)C.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02A )
401487889
7/22/2018
804. Visual Impacts: All long term facility structures will be painted a color that enables the facilities to blend in with the natural background color of the landscape, as seen from a viewing distance and location typically used by the public Maintain appearance with garbage clean-up; a trash bin will be located on site to accumulate waste by the personnel drilling the wells. Site will have unused equipment, trash and junk removed immediately.
Storm Water/Erosion ControlForm: (02A )
401487889
7/22/2018
Implement and maintain BMPs to control stormwater runoff in a manner that minimizes erosion, transport of sediment offsite, and site degradation. Co-locate flowlines and/or gathering lines whenever feasible, and mitigate any erosion problems that arise due to the construction of any pipeline(s).
Dust controlForm: (02A )
401487889
7/22/2018
805.c. Operator shall employ practices for control of fugitive dust caused by their operations. Such practices shall include but are not limited to the use of speed restrictions, regular road maintenance, restriction of construction activity during high- wind days, and silica dust controls when handling sand used in hydraulic fracturing operations. Additional management practices such as road surfacing, wind breaks and barriers may be used.
ConstructionForm: (02A )
401487889
7/22/2018
803. Permanent lighting will be installed around the facility to allow both the operator and haulers to conduct safe operations at night. All lights will be directed down toward the location or shielded so no light pollution leaves the facility.
Odor mitigationForm: (02A )
401487889
7/22/2018
805. Oil & gas facilities and equipment shall be operated in such a manner that odors do not constitute a nuisance or hazard to public welfare. Operator will utilize advanced oil based mud systems which target the reduction of aromatics.
Interim ReclamationForm: (02A )
401487889
7/22/2018
Operator shall be responsible for segregating the topsoil, backfilling, re-compacting, reseeding, and re-contouring the surface of any disturbed area so as not to interfere with Owner’s operations and shall reclaim such area to be returned to pre-existing conditions as best as possible with control of all noxious weeds.
 Form: (04 )
401768083
10/18/2018
Operator shall comply withe the Colorado Oil and Gas Conservation Cmmission Policy on the Use of Modular Large Volume Tanks in Colorado, dated June 13, 2014.