LOCATION453244Cottonwood Creek
4-65 27-28
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
3/1/2025
WILDCAT
99999
AURORA/ARAPAHOE  005
SWSE 27 4S65W 6
453244View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
401386670
10/10/2017
Operator shall comply with all requirements as set forth in the COGCC Notice to Operators for Interim Reclamation
OGLAForm: (02A)
401386670
10/10/2017
Operator shall comply with 1000-Series Rules for Interim Reclamation. All areas not in use for production activities shall be reclaimed in accordance with the 1000-Series Rules within 6 months of the spud date for the approved well. In the event additional operations are to occur within 12 months of the spud date, Operator shall submit a Rig Schedule showing a scheduled timeline of additional drilling operations via Form 4 Sundry. If additional drilling operations have not commenced at 12 months, Operator shall submit a Variance Request via Form 4 Sundry for compliance with additional bonding requirements as identified in the NTO for Interim Reclamation prior to the 12 month deadline.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02A )
402289762
6/12/2020
Operator will install stormwater controls around the perimeter of the location prior to construction and will include a ditch and berm system. They will remain in place through final reclamation or until pad is stabilized
Material Handling and Spill PreventionForm: (02A )
402289762
6/12/2020
Secondary Containment All facilities will be equipped with remote monitoring and remote shut down, which includes isolation at the well head. Engineered liner systems will be used in secondary steel containment systems for tank batteries. Pollution control containers (spill boxes) will be used on truck loading lines and placed within the limits of the secondary containment system. Automatic shutdown level devices will be installed on each tank with remote monitoring capabilities. Automatic shutdown level devices will be installed on all pressure vessels and liquid knockouts. Automatic shutdown pressure devices will be installed on flowlines from well heads to facilities with remote monitoring capabilities. Additionally, cathodic protection will be used on buried steel lines to mitigate corrosion. Automatic shutdown pressure devices will be installed on process vessels with remote monitoring capabilities.
Dust controlForm: (02A )
402289762
6/12/2020
Dust associated with Site activities and traffic on roads will be minimized throughout all phases such that there are no visible dust emissions from sites or roads to the maximum extent practicable given wind conditions. Numerous mitigation measures are in place to minimize dust emissions including (but not limited to): application of fresh water to roads and ground during earth moving activities, curtailment of work during windy conditions and re-establishment of vegetation on disturbed areas that are not graveled.
Noise mitigationForm: (02A )
402289762
6/12/2020
ConocoPhillips will use noise mitigation (berming, bales, or sound walls) during the drilling and completion phases for the Cottonwood Creek 4-65 27-28 well site. Based upon modeled receptor locations, the Cottonwood Creek 4-65 27-28 wellsite is predicted to comply with the A-weighted and C-weighted COGCC noise limits.
Emissions mitigationForm: (02A )
402289762
6/12/2020
Emissions Controls Combustors will be available at the Location during the entire production phase to eliminate fugitive emissions in the event of maintenance or emergency use. The device will be fired using natural gas and operate with a 98% or higher hydrocarbon destruction efficiency. The device will be designed and operated in a manner that will ensure no visible emissions during normal operation. Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, Operator shall not produce the wells without an approved variance per Rule 805.b.(3)C.
Odor mitigationForm: (02A )
402289762
6/12/2020
ConocoPhillips will mitigate odors by routing to closed loop systems to the maximum extent practicable. If ConocoPhillips receives complaints from a Residential Building within 1,320 feet from the site, ConocoPhillips will take measures to mitigate the odor within 24 hours, based on the specific circumstances.
Drilling/Completion OperationsForm: (02A )
402289762
6/12/2020
Lighting is only used during the Drilling and Completion Phases of operations. No permanent lighting will be installed. All lighting used will be situated so that is downcast and does not shine beyond the boundary of the oil and gas operations area.